November 2026 NYC DOB / ECB / OATH public-record review

2514 Bouck Avenue, Bronx, NY 10469 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 5 DOB/ECB OATH summonses with 2514 Bouck Avenue, Bronx, NY 10469. The source records identify vacate order compliance, work without a permit, plumbing or gas work without a permit and a hearing date of November 20, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Vacate order complianceWork without a permitPlumbing or gas work without a permitElectrical work without a permit

Property and hearing summary

Actual property address
2514 Bouck Avenue, Bronx, NY 10469
Borough
Bronx
BIN
2093438
BBL
2044680013 (2/4468/13)
Hearing month
November 2026
Violations on this page
5
Verified hearing date(s) in source extract
November 20, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202990R
Normalized: 039202990R
November 20, 2026
8:30 AM
CLASS - 1 Vacate order compliance
39202994Y
Normalized: 039202994Y
November 20, 2026
9:30 AM
CLASS - 1 Work without a permit
39203000N
Normalized: 039203000N
November 20, 2026
10:30 AM
CLASS - 1 Plumbing or gas work without a permit
39203009J
Normalized: 039203009J
November 20, 2026
9:30 AM
CLASS - 1 Electrical work without a permit
39203014Y
Normalized: 039203014Y
November 20, 2026
8:30 AM
CLASS - 1 Work without a permit

How the summonses fit together at this property

This property has 5 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202990R — Vacate order compliance

Normalized lookup key: 039202990R
OATH hearingNovember 20, 20268:30 AM

What DOB alleges

DOB alleges that a Vacate Order was not obeyed at the cited premises or area. The inspector's description specifically references cellar, Class A residential occupancy and Vacate Order.

Specific record details: cellar, Class A residential occupancy, Vacate Order. The description also references Vacate Order OP-64-25-02630.

Full violation description from the source extract

OCCUPANCY CONTRARY. I OBSERVED AN ILLEGAL 2BDRM CLASS A CELLAR APARTMENT. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEP 4, 1924. PARTIAL VACATE ORDER OP-64-25-02630 ISSUED, DISCONTINUE ILLEGAL OCCUPANCY OR AMEND

Issue date
August 5, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed AN ILLEGAL 2BDRM CLASS A CELLAR APARTMENT. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEP 4, 1924. PARTIAL VACATE ORDER OP-64-25-02630 ISSUED, DISCONTINUE ILLEGAL OCCUPANCY OR AMEND.

What this violation means

DOB is alleging noncompliance with a Vacate Order—typically that a space subject to an order was occupied or used contrary to the restriction. Vacate-order issues are safety-sensitive and should be verified against the exact order.

What may be required to correct the condition

The current Vacate Order, the area it covers, and the conditions required for rescission should be reviewed before occupancy resumes. Correction may involve building work, permits, professional reports, inspections and a formal DOB process to lift or modify the order.

What the OATH hearing may involve

At OATH, the exact order, its effective date and scope, the inspector's observation of occupancy/use, and any evidence that the order had been rescinded or did not cover the cited area may matter.

Possible defenses or factual issues worth investigating

Confirm the order number, premises/area covered, whether it was still effective on the inspection date, and what DOB required for rescission. If occupancy is disputed, gather contemporaneous evidence rather than relying on assumptions. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • the Vacate Order and any amendments/rescission notice
  • DOB inspection or reinspection records
  • photographs and access/occupancy evidence
  • permits, plans and professional reports used to correct the unsafe condition
  • communications or filings seeking rescission
Violation 2

Summons 39202994Y — Work without a permit

Normalized lookup key: 039202994Y
OATH hearingNovember 20, 20269:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references cellar, front area and partition walls.

Specific record details: cellar, front area, partition walls.

Full violation description from the source extract

WORK WITHOUT A PERMIT. I OBSERVED FULL HEIGHT PARTITIONS, DOOR FRAMES AND DOORS AND THE FRONT WINDOW REMOVED AND REPLACED WITH AN ENTRY DOOR INSTALLED IN THE CELLAR. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEP

Issue date
August 5, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed FULL HEIGHT PARTITIONS, DOOR FRAMES AND DOORS AND THE FRONT WINDOW REMOVED AND REPLACED WITH AN ENTRY DOOR INSTALLED IN THE CELLAR. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEP.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 3

Summons 39203000N — Plumbing or gas work without a permit

Normalized lookup key: 039203000N
OATH hearingNovember 20, 202610:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, bathroom fixtures, kitchen, stove, gas piping and plumbing lines/fixtures.

Specific record details: cellar, bathroom fixtures, kitchen, stove, gas piping, plumbing lines/fixtures.

Full violation description from the source extract

WORK WITHOUT A PERMIT. I OBSERVED A GAS LINE, GAS STOVE, KITCHEN SINK, 3 PIECE BATHROOM, WATER & WASTE LINES INSTALLED IN THE CELLAR. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEP 4, 1924. NO PLUMBING PERMIT ON

Issue date
August 5, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A GAS LINE, GAS STOVE, KITCHEN SINK, 3 PIECE BATHROOM, WATER & WASTE LINES INSTALLED IN THE CELLAR. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEP 4, 1924. NO PLUMBING PERMIT ON.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 4

Summons 39203009J — Electrical work without a permit

Normalized lookup key: 039203009J
OATH hearingNovember 20, 20269:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references cellar, electrical wiring/equipment and lighting/illumination.

Specific record details: cellar, electrical wiring/equipment, lighting/illumination.

Full violation description from the source extract

WORK WITHOUT A PERMIT. I OBSERVED ELECTRICAL OUTLETS, SWITCHES AND CEILING LIGHTING INSTALLED IN THE CELLAR. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEPT 4, 1924. NO ELECTRICAL PERMIT ON FILE, OBTAIN PERMIT; O

Issue date
August 5, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed ELECTRICAL OUTLETS, SWITCHES AND CEILING LIGHTING INSTALLED IN THE CELLAR. CONTRARY TO N.B. "B" PLAN NO. 2460 FILED SEPT 4, 1924. NO ELECTRICAL PERMIT ON FILE.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 5

Summons 39203014Y — Work without a permit

Normalized lookup key: 039203014Y
OATH hearingNovember 20, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction.

Full violation description from the source extract

WORK WITHOUT A PERMIT. I OBSERVED AN AWNING/CANOPY INSTALLED AROUND THE WHOLE PROPERTY AT ALL EXPOSURES WITH NO PERMIT ON FILE, OBTAIN PERMIT; SUBMIT THE CERTIFICATE OF CORRECTION FORM ATTACHED

Issue date
August 5, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed AN AWNING/CANOPY INSTALLED AROUND THE WHOLE PROPERTY AT ALL EXPOSURES WITH NO PERMIT ON FILE.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Property-specific resolution support

How Building Violation LLC may help at 2514 Bouck Avenue, Bronx, NY 10469

For 2514 Bouck Avenue, Bronx, NY 10469, the current source extract points to vacate order compliance, work without a permit, plumbing or gas work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.