November 2026 NYC DOB / ECB / OATH public-record review

30-34 West 26 Street, Manhattan, NY 10010 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 30-34 West 26 Street, Manhattan, NY 10010. The source records identify work not conforming to approved documents, failure to maintain and a hearing date of November 5, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work not conforming to approved documentsFailure to maintain

Property and hearing summary

Actual property address
30-34 West 26 Street, Manhattan, NY 10010
Borough
Manhattan
BIN
1015629
BBL
1008270064 (1/827/64)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 5, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202135X
Normalized: 039202135X
November 5, 2026
10:30 AM
CLASS - 1 Work not conforming to approved documents
39202147N
Normalized: 039202147N
November 5, 2026
9:30 AM
CLASS - 2 Failure to maintain

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202135X — Work not conforming to approved documents

Normalized lookup key: 039202135X
OATH hearingNovember 5, 202610:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents. The inspector's description specifically references first floor and electrical wiring/equipment.

Specific record details: first floor, electrical wiring/equipment.

Full violation description from the source extract

B1C8 - CLASS 1 - ELECTRICAL WORK DOES NOT CONFORM TO APPROVED SUBMITTAL DOCUMENTS/AMENDMENTS. ATOI OBSERVED ELECTRICAL WORK AT 1ST FLR COMMERCIAL SPACE DOES NOT CONFORM TO PERMITTED SCOPE OF WORK. JOB# M0145194

Issue date
August 27, 2026
Served date
August 27, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C8 — 27-3018(B) ELEC. WORK DOES NOT CONFORM TO APPROVED SUBMITTAL DOCUMENTS/AMENDMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning b1c8 - class 1 - electrical work does not conform to approved submittal documents/amendments. atoi observed electrical work at 1st floor commercial space does not conform to permitted scope of work. job# m0145194.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Violation 2

Summons 39202147N — Failure to maintain

Normalized lookup key: 039202147N
OATH hearingNovember 5, 20269:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner. The inspector's description specifically references basement.

Specific record details: basement.

Full violation description from the source extract

ATOI OBSERVED IN BASEMENT PVC PIPE USED ON HOT WATER HEATER VENTING. PER PC 701.9 PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE

Issue date
August 27, 2026
Served date
August 27, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed in basement pvc pipe used on hot water heater venting. per pc 701.9 plastic pipe. plastic piping and fittings shall not be used.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 30-34 West 26 Street, Manhattan, NY 10010

For 30-34 West 26 Street, Manhattan, NY 10010, the current source extract points to work not conforming to approved documents, failure to maintain. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.