Summons 39559170N — Work without a permit
Normalized lookup key: 039559170NWhat DOB alleges
DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references scaffold/shoring and exposure 1.
Specific record details: scaffold/shoring, exposure 1.
Full violation description from the source extract
RESPONDING TO A COMPLAINT OBSERVED: SUPPORTED SCAFFOLD TUBE AND COUPLER SYSTEM, INSTALLED AT EXPOSURE# 1 AND 2 OF PROPERTY. REACHING MORE THAN 40 FEET HEIGHT. UPON REVIEWING SYSTEM NO PERMIT HAS NOT YET BEEN IS
- Issue date
- September 15, 2026
- Served date
- September 15, 2026
- Source violation type
- Unknown
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning responding to a complaint observed: supported scaffold tube and coupler system, installed at exposure# 1 and 2 of property. reaching more than 40 feet height. upon reviewing system no permit has not yet been is.
What this violation means
DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.
What may be required to correct the condition
Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.
What the OATH hearing may involve
Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.
Possible defenses or factual issues worth investigating
Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.
Documents and evidence that may be useful
- DOB permit/application history
- approved plans and amendments
- photographs of the cited work
- contracts, invoices and contractor records
- proof of restoration/legalization and any inspection or sign-off records