November 2026 NYC DOB / ECB / OATH public-record review

3042 Kingsland Avenue, Bronx, NY 10469 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 3042 Kingsland Avenue, Bronx, NY 10469. The source records identify work without a permit, construction fence / site protection and a hearing date of November 20, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitConstruction fence / site protection

Property and hearing summary

Actual property address
3042 Kingsland Avenue, Bronx, NY 10469
Borough
Bronx
BIN
2062001
BBL
2047680059 (2/4768/59)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 20, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39559147P
Normalized: 039559147P
November 20, 2026
10:30 AM
CLASS - 2 Work without a permit
39559148R
Normalized: 039559148R
November 20, 2026
8:30 AM
CLASS - 2 Construction fence / site protection

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39559147P — Work without a permit

Normalized lookup key: 039559147P
OATH hearingNovember 20, 202610:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references construction fence.

Specific record details: construction fence.

Full violation description from the source extract

AT THE TIME OF INSPECTION OF A VACANT IN PLACE WITH CONSTRUCTION FENCE ERECTED AROUND, RESEARCH OF DEPARTMENTS OF BUILDINGS RECORDS I NOTICED NO PERMIT WAS OBTAIN PRIOR TO THE INSTALLMENT AND USE OF CONSTRUCTIO

Issue date
September 14, 2026
Served date
September 14, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of inspection of a vacant in place with construction fence erected around, research of departments of buildings records i noticed no permit was obtain prior to the installment and use of constructio.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39559148R — Construction fence / site protection

Normalized lookup key: 039559148R
OATH hearingNovember 20, 20268:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence.

Specific record details: construction fence.

Full violation description from the source extract

AT THE TIME OF INSPECTION OF A VACANT LOT IN PLACE, I OBSERVED A CONSTRUCTION FENCE ERECTED AROUND THE PROPERTY LINE NOT MAINTAINED AS PER CODE APPROX. 8FT BY 6FT GATE AREA MISSING AND LEANING OVER, CREATING A

Issue date
September 14, 2026
Served date
September 14, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A CONSTRUCTION FENCE ERECTED AROUND THE PROPERTY LINE NOT MAINTAINED AS PER CODE APPROX. 8FT BY 6FT GATE AREA MISSING AND LEANING OVER, CREATING A.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Property-specific resolution support

How Building Violation LLC may help at 3042 Kingsland Avenue, Bronx, NY 10469

For 3042 Kingsland Avenue, Bronx, NY 10469, the current source extract points to work without a permit, construction fence / site protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.