Summons 39203027N — Construction housekeeping / debris
Normalized lookup key: 039203027NWhat DOB alleges
DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping.
Specific record details: debris/housekeeping.
Full violation description from the source extract
AT TIME OF INSPECTION, OBSERVED, FEW FENCE PANELS ARE IDLY LEANING TO 306 BUILDINGS WALL AND SOME ARE LAYING ON THE PERKS GROUND, ALSO NOTED SOME CONSTRUCTION DEBRIS ARE FALLEN IN THE KOHLREITER SQUARE- PERK AR
- Issue date
- September 3, 2026
- Served date
- September 3, 2026
- Source violation type
- Construction
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED, FEW FENCE PANELS ARE IDLY LEANING TO 306 BUILDINGS WALL AND SOME ARE LAYING ON THE PERKS GROUND, ALSO NOTED SOME CONSTRUCTION DEBRIS ARE FALLEN IN THE KOHLREITER SQUARE- PERK AR.
What this violation means
The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.
What may be required to correct the condition
Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.
What the OATH hearing may involve
Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.
Possible defenses or factual issues worth investigating
Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.
Documents and evidence that may be useful
- dated photographs
- site-safety or housekeeping logs
- hauling/disposal receipts
- contractor records
- proof of correction