November 2026 NYC DOB / ECB / OATH public-record review

317-319 West 35 Street, Manhattan, NY 10001 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 317-319 West 35 Street, Manhattan, NY 10001. The source records identify dob/oath code-compliance issue, sidewalk shed / temporary construction protection and a hearing date of November 5, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

DOB/OATH code-compliance issueSidewalk shed / temporary construction protection

Property and hearing summary

Actual property address
317-319 West 35 Street, Manhattan, NY 10001
Borough
Manhattan
BIN
1013572
BBL
1007590029 (1/759/29)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 5, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39549883Y
Normalized: 039549883Y
November 5, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39549884X
Normalized: 039549884X
November 5, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39549883Y — DOB/OATH code-compliance issue

Normalized lookup key: 039549883Y
OATH hearingNovember 5, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 1, issued February 3, 2026.

Full violation description from the source extract

I OBSERVED STONE SLAB MATERIALS STORED ON EDGE, NOT FLAT ON THE STREET, WITHOUT CODE COMPLIANT BARRICADES CREATING A STRUCK BY OR CAUGHT IN BETWEEN CRUSH HAZARD IN THE EVENT OF A VEHICULAR ACCIDENT OR PUBLIC TA

Issue date
February 3, 2026
Served date
February 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 194 — BC 3303.4.5 & 27-1018 UNSAFE STORAGE OF MATERIALS DURING CONSTRUCTION OR DEMOLITION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed STONE SLAB MATERIALS STORED ON EDGE, NOT FLAT ON THE STREET, WITHOUT CODE COMPLIANT BARRICADES CREATING A STRUCK BY OR CAUGHT IN BETWEEN CRUSH HAZARD IN THE EVENT OF A VEHICULAR ACCIDENT OR PUBLIC TA.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 2

Summons 39549884X — Sidewalk shed / temporary construction protection

Normalized lookup key: 039549884X
OATH hearingNovember 5, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

I OBSERVED THE SIDEWALK SHED MISSING MUDSILLS AS REQUIRED BY CODE CREATING A CORROSION AND DISLODGEMENT HAZARD. MAINTAIN AS REQUIRED BY CODE BC3307.1.MAINTAIN AS REQUIRED BY CODE.

Issue date
February 3, 2026
Served date
February 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THE SIDEWALK SHED MISSING MUDSILLS AS REQUIRED BY CODE CREATING A CORROSION AND DISLODGEMENT HAZARD. MAINTAIN AS REQUIRED BY CODE BC3307.1.MAINTAIN AS REQUIRED BY CODE.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 317-319 West 35 Street, Manhattan, NY 10001

For 317-319 West 35 Street, Manhattan, NY 10001, the current source extract points to dob/oath code-compliance issue, sidewalk shed / temporary construction protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.