Summons 39201774H — Stop Work Order compliance
Normalized lookup key: 039201774HWhat DOB alleges
DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references Stop Work Order.
Specific record details: Stop Work Order. The description also references Stop Work Order DUE.
Full violation description from the source extract
AT TIME OF INSPECTION, ACTIVE CONSTRUCTION WAS NOTICED ON 2 STORY BUILDING. APPROVED PLANS INDICATE PERMEANT GUARDRAILS WERE TO BE INSTALLED. NONE WERE LOCATED AT THIS TIME. PARTIAL STOP WORK ORDER DUE TO THE S
- Issue date
- August 25, 2026
- Served date
- August 25, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection ACTIVE CONSTRUCTION WAS NOTICED ON 2 STORY BUILDING. APPROVED PLANS INDICATE PERMEANT GUARDRAILS WERE TO BE INSTALLED. NONE WERE LOCATED AT THIS TIME. PARTIAL STOP WORK ORDER DUE TO THE S.
What this violation means
The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.
What may be required to correct the condition
Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.
What the OATH hearing may involve
Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.
Possible defenses or factual issues worth investigating
Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.
Documents and evidence that may be useful
- Stop Work Order and related DOB inspection records
- permits and approved plans
- site photographs and daily logs
- rescind/partial-rescind correspondence or approvals
- contractor and site-safety records