November 2026 NYC DOB / ECB / OATH public-record review

338-340 Flatbush Avenue, Brooklyn, NY 11238 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 338-340 Flatbush Avenue, Brooklyn, NY 11238. The source records identify construction fence / site protection and a hearing date of November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protection

Property and hearing summary

Actual property address
338-340 Flatbush Avenue, Brooklyn, NY 11238
Borough
Brooklyn
BIN
3024374
BBL
3010580031 (3/1058/31)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558319H
Normalized: 039558319H
November 4, 2026
9:30 AM
CLASS - 2 Construction fence / site protection

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns construction fence / site protection; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558319H — Construction fence / site protection

Normalized lookup key: 039558319H
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence and exposure 1.

Specific record details: construction fence, exposure 1.

Full violation description from the source extract

. OBSERVED SITE WITH AN ERECTED CONSTRUCTION FENCE AT EXP 1, AND NO PROJECT INFORMATION PANEL IS POSTED AS REQUIRED PER BC 3301.9.

Issue date
August 24, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed site with an erected construction fence at exp 1, and no project information panel is posted as required per bc 3301.9.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Property-specific resolution support

How Building Violation LLC may help at 338-340 Flatbush Avenue, Brooklyn, NY 11238

For 338-340 Flatbush Avenue, Brooklyn, NY 11238, the current source extract points to construction fence / site protection. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.