November 2026 NYC DOB / ECB / OATH public-record review

34-01 32 Street, Queens, NY 11106 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 34-01 32 Street, Queens, NY 11106. The source records identify sidewalk shed / temporary construction protection and a hearing date of November 23, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protection

Property and hearing summary

Actual property address
34-01 32 Street, Queens, NY 11106
Borough
Queens
BIN
4008195
BBL
4006090027 (4/609/27)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 23, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39543814N
Normalized: 039543814N
November 23, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39543815P
Normalized: 039543815P
November 23, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Several descriptions point to the same area (sidewalk shed), which is a sign the summonses may be factually connected. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39543814N — Sidewalk shed / temporary construction protection

Normalized lookup key: 039543814N
OATH hearingNovember 23, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

DURING INSPECTION OF A SIDEWALK SHED I OBSERVED THAT THERE WAS NO INFO PANEL AFFIXED TO THE PARAPET, WHICH IS REQUIRED BY CODE TO BE IN PLACE. OBTAIN AND AFFIXED THE INFO PANEL TO THE SHED AS REQUIRED BY CODE.

Issue date
August 19, 2025
Served date
August 19, 2025
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT THERE WAS NO INFO PANEL AFFIXED TO THE PARAPET, WHICH IS REQUIRED BY CODE TO BE IN PLACE. OBTAIN AND AFFIXED THE INFO PANEL TO THE SHED AS REQUIRED BY CODE.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39543815P — Sidewalk shed / temporary construction protection

Normalized lookup key: 039543815P
OATH hearingNovember 23, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed and electrical wiring/equipment.

Specific record details: sidewalk shed, electrical wiring/equipment.

Full violation description from the source extract

DURING INSPECTION OF A SIDEWALK SHED IN PLACE, I OBSERVED THAT THERE WERE NO ELECTRICAL COMPONENTS (LIGHT BULBS) INSTALLED UNDER THE SHED, WHICH IS REQUIRED BY CODE, TO ILLUMINATE THE UNDERSIDE OF THE SHED DURI

Issue date
August 19, 2025
Served date
August 19, 2025
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT THERE WERE NO ELECTRICAL COMPONENTS (LIGHT BULBS) INSTALLED UNDER THE SHED, WHICH IS REQUIRED BY CODE, TO ILLUMINATE THE UNDERSIDE OF THE SHED DURI.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 34-01 32 Street, Queens, NY 11106

For 34-01 32 Street, Queens, NY 11106, the current source extract points to sidewalk shed / temporary construction protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.