November 2026 NYC DOB / ECB / OATH public-record review

34-02-34-06 Jordan Street, Queens, NY 11358 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 6 DOB/ECB OATH summonses with 34-02-34-06 Jordan Street, Queens, NY 11358. The source records identify sidewalk shed / temporary construction protection, electrical work without a permit, certificate of correction / compliance filing and hearing dates on November 10, 2026 and November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionElectrical work without a permitCertificate of Correction / compliance filingDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
34-02-34-06 Jordan Street, Queens, NY 11358
Borough
Queens
BIN
4135118
BBL
4060770007 (4/6077/7)
Hearing month
November 2026
Violations on this page
6
Verified hearing date(s) in source extract
November 10, 2026, November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39548973N
Normalized: 039548973N
November 10, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558322Z
Normalized: 039558322Z
November 10, 2026
8:30 AM
CLASS - 2 Electrical work without a permit
39558323K
Normalized: 039558323K
November 10, 2026
9:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558324M
Normalized: 039558324M
November 10, 2026
10:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39203509X
Normalized: 039203509X
November 17, 2026
10:30 AM
CLASS - 2 Certificate of Correction / compliance filing
39203510N
Normalized: 039203510N
November 17, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue

How the summonses fit together at this property

At least one summons concerns failure to file or obtain acceptance of a Certificate of Correction. That later compliance issue should be cross-checked against the underlying summons it references; paying or resolving one record does not automatically establish that the other record is closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39548973N — Sidewalk shed / temporary construction protection

Normalized lookup key: 039548973N
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references scaffold/shoring.

Specific record details: scaffold/shoring.

Full violation description from the source extract

AT TIME OF INSPECTION THE REQUIRED ENGINEER LETTER FOR USE OF SUSPENDED SCAFFOLD AND LETTER OF IMPOSED LOADS WERE NOT AVAILABLE FOR REVIEW. THIS CREATES UNSAFE CONDITIONS TO THE PUBLIC, PROPERTY, AND USER WITHO

Issue date
January 9, 2026
Served date
January 9, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection THE REQUIRED ENGINEER LETTER FOR USE OF SUSPENDED SCAFFOLD AND LETTER OF IMPOSED LOADS WERE NOT AVAILABLE FOR REVIEW. THIS CREATES UNSAFE CONDITIONS TO THE PUBLIC, PROPERTY, AND USER WITHO.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39558322Z — Electrical work without a permit

Normalized lookup key: 039558322Z
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references sidewalk shed, electrical wiring/equipment and exposure 1.

Specific record details: sidewalk shed, electrical wiring/equipment, exposure 1.

Full violation description from the source extract

DURING INSPECTION OF A SIDEWALK SHED IN PLACE AT EXPOSURE #1 AND #4 WITH ILLUMINATED LIGHT BULBS UNDERNEATH, DOB RECORDS REVEALED THAT THERE WAS NEVER AN ACTIVE PERMIT FOR THE INSTALLATION OF THE ELECTRICAL COM

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning during inspection of a sidewalk shed in place at exposure #1 and #4 with illuminated light bulbs underneath, DOB records revealed that there was never an active permit for the installation of the electrical com.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 3

Summons 39558323K — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558323K
OATH hearingNovember 10, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

DURING INSPECTION OF A SIDEWALK SHED IN PLACE, DOB RECORDS REVEALED THAT THE SHED PERMIT HAD EXPIRED ON 08/20/2026 WITH NO RENEWAL IN PROCESS. ALL PERMITS MUST BE MAINTAINED AS LONG AS THE TEMPORARY EQUIPMENT I

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning during inspection of a sidewalk shed in place, DOB records revealed that the shed permit had expired on 08/20/2026 with no renewal in process. all permits must be maintained as long as the temporary equipment i.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 4

Summons 39558324M — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558324M
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

3307.6.5.1 SAFE CONDITION: DURING INSPECTION OF A SIDEWALK SHED IN PLACE I OBSERVED THAT SEVERAL OF THE CROSS BRACE BOLTS IN THE PEDESTRIAN WALKWAY WAS MISSING THE REQUIRED BOLT CAP COVERS. THE EXPOSED BOLTS PO

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT SEVERAL OF THE CROSS BRACE BOLTS IN THE PEDESTRIAN WALKWAY WAS MISSING THE REQUIRED BOLT CAP COVERS. THE EXPOSED BOLTS PO.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 5

Summons 39203509X — Certificate of Correction / compliance filing

Normalized lookup key: 039203509X
OATH hearingNovember 17, 202610:30 AM

What DOB alleges

DOB alleges that a required Certificate of Correction was not filed or accepted for an earlier summons. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction. The description also references prior summons 35683166N.

Full violation description from the source extract

FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 35683166N, FILE A CERTIFICATE OF CORRECTION

Issue date
September 9, 2026
Served date
September 9, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 35683166n, file a certificate of correction.

What this violation means

This summons alleges failure to comply with a prior Commissioner's order by filing an acceptable Certificate of Correction for an earlier summons. The underlying violation and the later compliance summons are separate records that should be tracked together.

What may be required to correct the condition

First identify the underlying summons referenced in the description and verify whether the physical condition was corrected, whether a Certificate of Correction was submitted, and its current DOB status. If correction is still outstanding, the underlying condition generally has to be addressed before an acceptable certification package can be completed.

What the OATH hearing may involve

The hearing may turn on the status of the underlying summons, the order to certify correction, the timing and adequacy of any submission, and whether DOB records show an accepted, rejected or missing Certificate of Correction.

Possible defenses or factual issues worth investigating

Verify the underlying summons number, correction deadline/order, any prior Certificate of Correction request, disapproval reason, and whether later agency activity changed the status. Do not assume payment of an OATH penalty closed the DOB correction requirement. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • copy/status of the underlying summons
  • Certificate of Correction submission and DOB response
  • proof of physical correction such as photographs, receipts or permits
  • DOB NOW/BIS status records
  • OATH disposition and payment records if relevant
Violation 6

Summons 39203510N — DOB/OATH code-compliance issue

Normalized lookup key: 039203510N
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 1, issued September 9, 2026.

Full violation description from the source extract

FAILURE TO COMPLY TO COMMISSIONER'S ORDER TO OBTAIN AN CORRECTIVE ACTION PLAN REPORT FOR VIOLATION #35719017L. AS OF 9/9/2026, NO CORRECTIVE ACTION PLAN REPORT HAS BEEN FILED WITHIN DEPT. RECORDS, COMPLY WITH C

Issue date
September 9, 2026
Served date
September 9, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to comply to commissioner's order to obtain an corrective action plan report for violation #35719017l. as of 9/9/2026, no corrective action plan report has been filed within dept. records, comply with c.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 34-02-34-06 Jordan Street, Queens, NY 11358

For 34-02-34-06 Jordan Street, Queens, NY 11358, the current source extract points to sidewalk shed / temporary construction protection, electrical work without a permit, certificate of correction / compliance filing. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.