Summons 39555884R — DOB/OATH code-compliance issue
Normalized lookup key: 039555884RWhat DOB alleges
DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references exposure 1.
Specific record details: exposure 1.
Full violation description from the source extract
MISCELLANEOUS VIOLATIONS. AT THE TIME OF INSPECTION OF A 9 STORY NEW BUILDING AT 3 FLOOR DECKING LEVEL, I OBSERVED ON STREET 1 LARGE GENERATOR AT EXPOSURE #1. UPON REQUEST FOR DOT PERMIT NONE WAS PROVIDED OR AT
- Issue date
- June 25, 2026
- Served date
- July 9, 2026
- Source violation type
- Unknown
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 1P7
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed ON STREET 1 LARGE GENERATOR AT EXPOSURE #1. UPON REQUEST FOR DOT PERMIT NONE WAS PROVIDED OR AT.
What this violation means
This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.
What may be required to correct the condition
Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.
What the OATH hearing may involve
Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.
Possible defenses or factual issues worth investigating
Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.
Documents and evidence that may be useful
- the summons and current OATH status
- dated photographs
- relevant DOB permits/plans/violations
- contracts, invoices or professional reports tied to the cited condition
- proof of correction where available