November 2026 NYC DOB / ECB / OATH public-record review

367 Tompkins Avenue, Brooklyn, NY 11216 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 367 Tompkins Avenue, Brooklyn, NY 11216. The source records identify sidewalk shed / temporary construction protection, work without a permit, construction fence / site protection and a hearing date of November 18, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionWork without a permitConstruction fence / site protection

Property and hearing summary

Actual property address
367 Tompkins Avenue, Brooklyn, NY 11216
Borough
Brooklyn
BIN
3051709
BBL
3018250002 (3/1825/2)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 18, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558644L
Normalized: 039558644L
November 18, 2026
10:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558645N
Normalized: 039558645N
November 18, 2026
8:30 AM
CLASS - 2 Work without a permit
39558646P
Normalized: 039558646P
November 18, 2026
9:30 AM
CLASS - 2 Construction fence / site protection

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (front), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558644L — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558644L
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references front yard, front area, sidewalk shed and exposure 1.

Specific record details: front yard, front area, sidewalk shed, exposure 1.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED/OHP IN PLACE AT EXPOSURE# 1 FRONT YARD WITH PERMIT# B08011977-I1-SH UPON REVIEW DEPARTMENT RECORD IT APPEAR PERMIT EXPIRED ON 06/10/2024. CREATING AN UNSAFE CONDITI

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P8

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED: SIDEWALK SHED/OHP IN PLACE AT EXPOSURE# 1 FRONT YARD WITH PERMIT# B08011977-I1-SH UPON REVIEW DEPARTMENT RECORD IT APPEAR PERMIT EXPIRED ON 06/10/2024. CREATING AN UNSAFE CONDITI.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39558645N — Work without a permit

Normalized lookup key: 039558645N
OATH hearingNovember 18, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references front yard, front area, construction fence and exposure 1.

Specific record details: front yard, front area, construction fence, exposure 1.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED: CONSTRUCTION FENCE AT EXPOSURE# 1 FRONT YARD. UPON REVIEWING DEPARTMENT RECORDS, WORK PERMIT HAS NOT YET BEEN ISSUED, CREATING AN UNSAFE CONDITION, NO SUPERVISION, SAFETY MONITOR

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED: CONSTRUCTION FENCE AT EXPOSURE# 1 FRONT YARD. UPON REVIEWING DEPARTMENT RECORDS, WORK PERMIT HAS NOT YET BEEN ISSUED, CREATING AN UNSAFE CONDITION, NO SUPERVISION, SAFETY MONITOR.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 3

Summons 39558646P — Construction fence / site protection

Normalized lookup key: 039558646P
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references front yard, front area and construction fence.

Specific record details: front yard, front area, construction fence.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED: CONSTRUCTION FENCE AT EXPO# 1 FRONT YARD WAS FOUND TO HAVE EXCESSIVE, NON-CONSTRUCTION RELATED ADVERTISING EXCESSIVE GRAFFITI AND OBSTRUCTED VIEW PANELS. CREATING A POTENTIAL SAF

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED: CONSTRUCTION FENCE AT EXPO# 1 FRONT YARD WAS FOUND TO HAVE EXCESSIVE, NON-CONSTRUCTION RELATED ADVERTISING EXCESSIVE GRAFFITI AND OBSTRUCTED VIEW PANELS. CREATING A POTENTIAL SAF.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Property-specific resolution support

How Building Violation LLC may help at 367 Tompkins Avenue, Brooklyn, NY 11216

For 367 Tompkins Avenue, Brooklyn, NY 11216, the current source extract points to sidewalk shed / temporary construction protection, work without a permit, construction fence / site protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.