November 2026 NYC DOB / ECB / OATH public-record review

3813-3821 18 Avenue, Brooklyn, NY 11218 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 3813-3821 18 Avenue, Brooklyn, NY 11218. The source records identify sidewalk shed / temporary construction protection and a hearing date of November 2, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protection

Property and hearing summary

Actual property address
3813-3821 18 Avenue, Brooklyn, NY 11218
Borough
Brooklyn
BIN
3127735
BBL
3054170029 (3/5417/29)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 2, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39174172J
Normalized: 039174172J
November 2, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39174173L
Normalized: 039174173L
November 2, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39174172J — Sidewalk shed / temporary construction protection

Normalized lookup key: 039174172J
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references roof, fire escape and scaffold/shoring.

Specific record details: roof, fire escape, scaffold/shoring.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED FAILURE TO MAINTAIN SUSPENDED SCAFFOLD ROPE LEFT UNATTENDED ON THE FIRE ESCAPE ALL THE DOWN,ALSO THE TIGHT OFF ROPE LINE ON THE ROOF NOT MARK OR CAUTION TAPE TO AVOID TRIP HAZARD.

Issue date
January 15, 2026
Served date
January 15, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED FAILURE TO MAINTAIN SUSPENDED SCAFFOLD ROPE LEFT UNATTENDED ON THE FIRE ESCAPE ALL THE DOWN,ALSO THE TIGHT OFF ROPE LINE ON THE ROOF NOT MARK OR CAUTION TAPE TO AVOID TRIP HAZARD.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation. Any correction should preserve the required egress route rather than simply moving the problem to another part of the exit system.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39174173L — Sidewalk shed / temporary construction protection

Normalized lookup key: 039174173L
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references front area and scaffold/shoring.

Specific record details: front area, scaffold/shoring. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

PSWO ISSUED FOR FAILURE TO NOTIFY DEPT OF BUILDINGS PRIOR TO INSTALLATION OF SUSPENDED SCAFFOLD AT TIME OF INSPECTION OBSERVED AT THE FRONT DOOR BUILDING ENTRANCE SUSPENDED SCAFFOLD LEFT HANGING OUT ON THE PARA

Issue date
January 15, 2026
Served date
January 15, 2026
Source violation type
Cranes and Derricks
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED AT THE FRONT DOOR BUILDING ENTRANCE SUSPENDED SCAFFOLD LEFT HANGING OUT ON THE PARA.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 3813-3821 18 Avenue, Brooklyn, NY 11218

For 3813-3821 18 Avenue, Brooklyn, NY 11218, the current source extract points to sidewalk shed / temporary construction protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.