November 2026 NYC DOB / ECB / OATH public-record review

403 Berry Street, Brooklyn, NY 11249 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 403 Berry Street, Brooklyn, NY 11249. The source records identify work without a permit, construction housekeeping / debris, stop work order compliance and a hearing date of November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitConstruction housekeeping / debrisStop Work Order complianceStructural or exterior maintenance

Property and hearing summary

Actual property address
403 Berry Street, Brooklyn, NY 11249
Borough
Brooklyn
BIN
3059584
BBL
3021370006 (3/2137/6)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202354X
Normalized: 039202354X
November 4, 2026
9:30 AM
CLASS - 2 Work without a permit
39202355H
Normalized: 039202355H
November 4, 2026
10:30 AM
CLASS - 2 Construction housekeeping / debris
39202515H
Normalized: 039202515H
November 4, 2026
10:30 AM
CLASS - 1 Stop Work Order compliance
39202519P
Normalized: 039202519P
November 4, 2026
8:30 AM
CLASS - 2 Structural or exterior maintenance

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202354X — Work without a permit

Normalized lookup key: 039202354X
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references front area, brick/masonry condition and exposure 1.

Specific record details: front area, brick/masonry condition, exposure 1. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

PSWO ISSUED FOR WORK WITHOUT A PERMIT FRONT ENTIRE MASONRY STAIRCASE AND LANDING WAS REMOVED AT EXPOSURE 1 NEW CMU WALL AND STAIRS LANDING ERECTED ALSO FIRST FLOOR WINDOWS STEEL LINTEL REMOVED WIDING THE OPENIN

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning pswo issued for work without a permit front entire masonry staircase and landing was removed at exposure 1 new cmu wall and stairs landing erected also first floor windows steel lintel removed widing the openin.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39202355H — Construction housekeeping / debris

Normalized lookup key: 039202355H
OATH hearingNovember 4, 202610:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping.

Specific record details: debris/housekeeping.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED CONTAINER HOLDING DEBRIS OR WASTE SHALL BE COVERED AT THE END OF THE WORKDAY AND AT ANY TIME WHEN FULL NEAR THE RIM.; BC-3303.4.2, COMPLY WITH CODE

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 206 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED CONTAINER HOLDING DEBRIS OR WASTE SHALL BE COVERED AT THE END OF THE WORKDAY AND AT ANY TIME WHEN FULL NEAR THE RIM.; BC-3303.4.2.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 3

Summons 39202515H — Stop Work Order compliance

Normalized lookup key: 039202515H
OATH hearingNovember 4, 202610:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction.

The description also references Stop Work Order EXISTING.

Full violation description from the source extract

ATOI OBSERVED WORKER USING CUTTING BRICKS TO CONTINUE CONSTRUCTION OF NEW MAIN ENTRY STAIRCASE, VIOLATING PSWO EXISTING ON PROPERTY RELATED TO COMPLAINT #3A78251 FOR DEMOLITION & CONSTRUCTION OF NEW STAIRCASE W

Issue date
August 31, 2026
Served date
August 31, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed worker using cutting bricks to continue construction of new main entry staircase, violating pswo existing on property related to complaint #3a78251 for demolition & construction of new staircase w.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 4

Summons 39202519P — Structural or exterior maintenance

Normalized lookup key: 039202519P
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references railing/guard condition and brick/masonry condition.

Specific record details: railing/guard condition, brick/masonry condition.

Full violation description from the source extract

ATOI OBSERVED STAIRCASE CONSTRUCTED W/O PERMIT, NOT EQUIPPED WITH REQUIRED GUARDRAIL SERVING MAIN ENTRY OF OCCUPIED BLDG. ALSO OBSERVED A WORKER OPERATING BRICK-CUTTING MACHINE & CONSTRUCTION MATERIALS OBSTRUCT

Issue date
August 31, 2026
Served date
August 31, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed staircase constructed without permit, not equipped with required guardrail serving main entry of occupied bldg. also observed a worker operating brick-cutting machine & construction materials obstruct.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Property-specific resolution support

How Building Violation LLC may help at 403 Berry Street, Brooklyn, NY 11249

For 403 Berry Street, Brooklyn, NY 11249, the current source extract points to work without a permit, construction housekeeping / debris, stop work order compliance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.