Summons 39540181Z — Construction fence / site protection
Normalized lookup key: 039540181ZWhat DOB alleges
DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter.
Record context: source category Construction, severity CLASS - 2, issued May 14, 2025.
Full violation description from the source extract
@3STORY NB SITE WITH FOUNDATION POURED OBSERVE JOB FENCE NOT TO CODES-VIEWING PANEL NOT 12"X12"(7"X7")+SITE VIEW OBSTRUCTED BY PORTABLE TOILET, NOT BUILT SOLID WITH HOLES IN PLYWOOD,& PROTRUDING NAILS ADJACENT
- Issue date
- May 14, 2025
- Served date
- May 14, 2025
- Source violation type
- Construction
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @3story nb site with foundation poured observe job fence not to codes-viewing panel not 12"x12"(7"x7")+site view obstructed by portable toilet, not built solid with holes in plywood,& protruding nails adjacent.
What this violation means
The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.
What may be required to correct the condition
The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.
What the OATH hearing may involve
Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.
Possible defenses or factual issues worth investigating
Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.
Documents and evidence that may be useful
- site-protection/construction-fence drawings
- dated photographs
- site-safety inspection logs
- contractor repair records
- reinspection records