November 2026 NYC DOB / ECB / OATH public-record review

433 Park Avenue South, Manhattan, NY 10016 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 433 Park Avenue South, Manhattan, NY 10016. The source records identify dob/oath code-compliance issue, electrical work without a permit and a hearing date of November 19, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

DOB/OATH code-compliance issueElectrical work without a permit

Property and hearing summary

Actual property address
433 Park Avenue South, Manhattan, NY 10016
Borough
Manhattan
BIN
1018295
BBL
1008850092 (1/885/92)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 19, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39203825H
Normalized: 039203825H
November 19, 2026
10:30 AM
CLASS - 2 DOB/OATH code-compliance issue
39203826J
Normalized: 039203826J
November 19, 2026
8:30 AM
CLASS - 1 Electrical work without a permit

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39203825H — DOB/OATH code-compliance issue

Normalized lookup key: 039203825H
OATH hearingNovember 19, 202610:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment.

Full violation description from the source extract

I OBSERVED IN THIRD FLOOR HALLWAY UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, LIVE MAIN FEEDERS FOR THIRD FLOOR OLD PANEL EXPOSED AND HANGING OFF WALL WITHOUT A COVER., COMPLY WITH EC; FIX ALL CONDITIONS AS PER NE

Issue date
September 11, 2026
Served date
September 11, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed IN THIRD FLOOR HALLWAY UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, LIVE MAIN FEEDERS FOR THIRD FLOOR OLD PANEL EXPOSED AND HANGING OFF WALL WITHOUT A COVER., COMPLY WITH EC; FIX ALL CONDITIONS AS PER NE.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 2

Summons 39203826J — Electrical work without a permit

Normalized lookup key: 039203826J
OATH hearingNovember 19, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment.

Full violation description from the source extract

I DID OBSERVED INSTALLATION OF LIGHT FIXTURES AND EMERGENCY BATTERY LIGHTS IN STAIRWELL WITHOUT AN ELECTRICAL PERMIT ON FILE APP M00724091 DOESN'T COVER WORK DONE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT

Issue date
September 11, 2026
Served date
September 11, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning i did observed installation of light fixtures and emergency battery lights in stairwell without an electrical permit on file app m00724091 doesn't cover work done.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Property-specific resolution support

How Building Violation LLC may help at 433 Park Avenue South, Manhattan, NY 10016

For 433 Park Avenue South, Manhattan, NY 10016, the current source extract points to dob/oath code-compliance issue, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.