November 2026 NYC DOB / ECB / OATH public-record review

446 West 50 Street, Manhattan, NY 10019 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 446 West 50 Street, Manhattan, NY 10019. The source records identify electrical work without a permit, fire-safety condition and a hearing date of November 19, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Electrical work without a permitFire-safety condition

Property and hearing summary

Actual property address
446 West 50 Street, Manhattan, NY 10019
Borough
Manhattan
BIN
1026653
BBL
1010590056 (1/1059/56)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 19, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39204138K
Normalized: 039204138K
November 19, 2026
9:30 AM
CLASS - 1 Electrical work without a permit
39204139M
Normalized: 039204139M
November 19, 2026
10:30 AM
CLASS - 1 Fire-safety condition

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39204138K — Electrical work without a permit

Normalized lookup key: 039204138K
OATH hearingNovember 19, 20269:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references cellar and electrical wiring/equipment.

Specific record details: cellar, electrical wiring/equipment.

Full violation description from the source extract

ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED NEW WIRING BEING INSTALLED BY 2 WORKERS, FOR NEW INSTALLED BOILER IN CELLAR WITHOUT PERMITS FILED WITH DOB., OBTAIN PERMIT

Issue date
September 15, 2026
Served date
September 15, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning electrical work without a permit. observed new wiring being installed by 2 workers, for new installed boiler in cellar without permits filed with DOB.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 2

Summons 39204139M — Fire-safety condition

Normalized lookup key: 039204139M
OATH hearingNovember 19, 202610:30 AM

What DOB alleges

DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references combustible materials.

Specific record details: combustible materials.

Full violation description from the source extract

FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. OBSERVED EXCESSIVE STORAGE HAVING COMBUSTIBLE MATERIALS ( WOOD PALLETS, CARDBOARD) MISC HOUSEHOLD ITEMS (TOOLS, BICYCLES, CHAIRS, PLASTIC CONT

Issue date
September 15, 2026
Served date
September 15, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1N5

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain adequate housekeeping per section requirements. observed excessive storage having combustible materials ( wood pallets, cardboard) misc household items (tools, bicycles, chairs, plastic cont.

What this violation means

DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.

What may be required to correct the condition

The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed.

What the OATH hearing may involve

Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.

Possible defenses or factual issues worth investigating

Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required.

Documents and evidence that may be useful

  • dated photographs
  • fire-protection/system records where relevant
  • repair/removal invoices
  • approved plans if rated construction or equipment is involved
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 446 West 50 Street, Manhattan, NY 10019

For 446 West 50 Street, Manhattan, NY 10019, the current source extract points to electrical work without a permit, fire-safety condition. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.