November 2026 NYC DOB / ECB / OATH public-record review

45-44 39 Place, Queens, NY 11104 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 45-44 39 Place, Queens, NY 11104. The source records identify work without a permit, failure to maintain, dob/oath code-compliance issue and a hearing date of November 30, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitFailure to maintainDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
45-44 39 Place, Queens, NY 11104
Borough
Queens
BIN
4002634
BBL
4001950050 (4/195/50)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 30, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39155835H
Normalized: 039155835H
November 30, 2026
9:00 AM
CLASS - 3 Work without a permit
39155836J
Normalized: 039155836J
November 30, 2026
9:00 AM
CLASS - 3 Failure to maintain
39155837L
Normalized: 039155837L
November 30, 2026
9:00 AM
CLASS - 3 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (front), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39155835H — Work without a permit

Normalized lookup key: 039155835H
OATH hearingNovember 30, 20269:00 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references roof and front area.

Specific record details: roof, front area.

Full violation description from the source extract

WORK W/O A PERMIT. NOTED AT FRONT OF PREMISES: AT FRONT PORCH ERECTED A STEEL CANOPY WITH PLASTIC/VINYL ROOF., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION

Issue date
August 4, 2025
Served date
August 4, 2025
Source violation type
Construction
Severity
CLASS - 3
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 301 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without a permit. noted at front of premises: at front porch erected a steel canopy with plastic/vinyl roof.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39155836J — Failure to maintain

Normalized lookup key: 039155836J
OATH hearingNovember 30, 20269:00 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner.

Record context: source category Construction, severity CLASS - 3, issued August 4, 2025.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED AT DRIVEWAY: RAIN GUTTER LEADER PIPE IS NOT CONNECTED TO THE SEWER DRAIN., REPAIR AND OR REPLACE

Issue date
August 4, 2025
Served date
August 4, 2025
Source violation type
Construction
Severity
CLASS - 3
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 302 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in code compliant manner. noted at driveway: rain gutter leader pipe is not connected to the sewer drain., repair and or replace.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Violation 3

Summons 39155837L — DOB/OATH code-compliance issue

Normalized lookup key: 039155837L
OATH hearingNovember 30, 20269:00 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references front area.

Specific record details: front area.

Full violation description from the source extract

FENCE EXCEEDS PERMITTED HEIGHT. NOTED AT FRONT OF PREMISES: DRIVE WAY GATE IS APPROX 5' IN HEIGHT IN VIOLATION OF THE 4' MAX HEIGHT REQUIREMENT., CONFORM FENCE TO HEIGHT REQUIREMENT

Issue date
August 4, 2025
Served date
August 4, 2025
Source violation type
Construction
Severity
CLASS - 3
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 307 — 27-509,BC 3111.1 FENCE EXCEEDS PERMITTED HEIGHT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning fence exceeds permitted height. noted at front of premises: drive way gate is approx 5' in height in violation of the 4' max height requirement., conform fence to height requirement.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 45-44 39 Place, Queens, NY 11104

For 45-44 39 Place, Queens, NY 11104, the current source extract points to work without a permit, failure to maintain, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.