November 2026 NYC DOB / ECB / OATH public-record review

464 Park Avenue, Brooklyn, NY 11205 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 464 Park Avenue, Brooklyn, NY 11205. The source records identify sidewalk shed / temporary construction protection, dob/oath code-compliance issue and a hearing date of November 18, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
464 Park Avenue, Brooklyn, NY 11205
Borough
Brooklyn
BIN
3054742
BBL
3018990031 (3/1899/31)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 18, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558858R
Normalized: 039558858R
November 18, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558862J
Normalized: 039558862J
November 18, 2026
9:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558864N
Normalized: 039558864N
November 18, 2026
10:30 AM
CLASS - 2 DOB/OATH code-compliance issue
39558868K
Normalized: 039558868K
November 18, 2026
9:30 AM
CLASS - 2 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (sidewalk shed), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558858R — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558858R
OATH hearingNovember 18, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1. UPON REVIEW OF DOB RECORDS SIDEWALK SHED PERMIT #B01404166 EXPIRED ON 8-20-2026 AND HAS NOT BEEN RENEWED.

Issue date
September 8, 2026
Served date
September 8, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P8

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A SIDEWALK SHED INSTALLED AT EXPOS 1. UPON REVIEW OF DOB RECORDS SIDEWALK SHED PERMIT #B01404166 EXPIRED ON 8-20-2026 AND HAS NOT BEEN RENEWED.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39558862J — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558862J
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 CONTRARY TO CODE. VERTICAL MEMBER INSTALLED WITHIN 18 INCHES FROM THE FACE OF THE CURB LINE CONTRARY TO CODE 3307.6.4.4 . 12FT MINIMUM HEIGHT NOT

Issue date
September 8, 2026
Served date
September 8, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A SIDEWALK SHED INSTALLED AT EXPOS 1 CONTRARY TO CODE. VERTICAL MEMBER INSTALLED WITHIN 18 INCHES FROM THE FACE OF THE CURB LINE CONTRARY TO CODE 3307.6.4.4 . 12FT MINIMUM HEIGHT NOT.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 3

Summons 39558864N — DOB/OATH code-compliance issue

Normalized lookup key: 039558864N
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 2, issued September 8, 2026.

Full violation description from the source extract

UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH NO FENCE PROJECT INFO PANEL INSTALLED CONTRARY TO CODE 3301.9.1 FENCE PROJECT INFORMATION PANEL. WHERE A SITE IS ENCLOSED WITH A FENCE IN ACCORDANCE

Issue date
September 8, 2026
Served date
September 8, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A FENCE INSTALLED AT EXPOS 1 WITH NO FENCE PROJECT INFO PANEL INSTALLED CONTRARY TO CODE 3301.9.1 FENCE PROJECT INFORMATION PANEL. WHERE A SITE IS ENCLOSED WITH A FENCE IN ACCORDANCE.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 4

Summons 39558868K — DOB/OATH code-compliance issue

Normalized lookup key: 039558868K
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 2, issued September 8, 2026.

Full violation description from the source extract

UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH NO "NO SMOKING" SIGN INSTALLED/PROVIDED IN ACCORDANCE WITH THE PROVISIONS OF THE NEW YORK CITY FIRE CODE.NO SMOKING SIGNS SHALL BE POSTED AT THE SITE

Issue date
September 8, 2026
Served date
September 8, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2A9 — BC 3303.7.3 FAILURE TO POST NO SMOKING SIGNS AT CONST/DEMO SITE PER FIRE CODE

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A FENCE INSTALLED AT EXPOS 1 WITH NO "NO SMOKING" SIGN INSTALLED/PROVIDED IN ACCORDANCE WITH THE PROVISIONS OF THE NEW YORK CITY FIRE CODE.NO SMOKING SIGNS SHALL BE POSTED AT THE SITE.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 464 Park Avenue, Brooklyn, NY 11205

For 464 Park Avenue, Brooklyn, NY 11205, the current source extract points to sidewalk shed / temporary construction protection, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.