November 2026 NYC DOB / ECB / OATH public-record review

50-13 Kissena Boulevard, Queens, NY 11355 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 50-13 Kissena Boulevard, Queens, NY 11355. The source records identify construction-site safety, work not conforming to approved documents and a hearing date of November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction-site safetyWork not conforming to approved documents

Property and hearing summary

Actual property address
50-13 Kissena Boulevard, Queens, NY 11355
Borough
Queens
BIN
4118025
BBL
4052230042 (4/5223/42)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558981M
Normalized: 039558981M
November 17, 2026
8:30 AM
CLASS - 1 Construction-site safety
39558982Y
Normalized: 039558982Y
November 17, 2026
9:30 AM
CLASS - 1 Work not conforming to approved documents

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558981M — Construction-site safety

Normalized lookup key: 039558981M
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency. The inspector's description specifically references excavation and exposure 2.

Specific record details: excavation, exposure 2.

Full violation description from the source extract

@NB SITE IN EXCAVATION PHASE OBSERVE EXCAVATION APPROX.40'L X 12'W X 12'D ALONG EXP#2 ADJACENT TO NEIGHBOR PROPERTIES GARAGES/SHED WITHIN EXCAVATION INFLUENCE&UPON REQUEST SITE PERSONNEL FOR PRECONSTRUCTION SUR

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Site Safety
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @nb site in excavation phase observe excavation approx.40'l x 12'w x 12'd along exp#2 adjacent to neighbor properties garages/shed within excavation influence&upon request site personnel for preconstruction sur.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Violation 2

Summons 39558982Y — Work not conforming to approved documents

Normalized lookup key: 039558982Y
OATH hearingNovember 17, 20269:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents. The inspector's description specifically references excavation and exposure 2.

Specific record details: excavation, exposure 2.

Full violation description from the source extract

SUPPORT OF EXCAVATION.OBSERVE SITES EXCAVATION OPERATIONS NOT CONFORM TO PLANS AFFECTING HEALTH&LIFE SAFETY-EXP#2 EXCAVATION SHEAR CUT&SLOPE NOT MAINTAIN 45DEGRESS ADJACENT TO NEIGHBOR GARAGES POTENTIALLY COMPR

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning support of excavation.observe sites excavation operations not conform to plans affecting health&life safety-exp#2 excavation shear cut&slope not maintain 45degress adjacent to neighbor garages potentially compr.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Property-specific resolution support

How Building Violation LLC may help at 50-13 Kissena Boulevard, Queens, NY 11355

For 50-13 Kissena Boulevard, Queens, NY 11355, the current source extract points to construction-site safety, work not conforming to approved documents. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.