506 East 94 Street, Brooklyn, NY 11212 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 5 DOB/ECB OATH summonses with 506 East 94 Street, Brooklyn, NY 11212. The source records identify work not conforming to approved documents, dob/oath code-compliance issue, stop work order compliance and hearing dates on November 18, 2026, November 25, 2026 and November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work not conforming to approved documentsDOB/OATH code-compliance issueStop Work Order compliance

Property and hearing summary

Actual property address
506 East 94 Street, Brooklyn, NY 11212
Borough
Brooklyn
BIN
3102574
BBL
3046900073 (3/4690/73)
Hearing month
November 2026
Violations on this page
5
Verified hearing date(s) in source extract
November 18, 2026, November 25, 2026, November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558396L
Normalized: 039558396L
November 4, 2026
9:30 AM
CLASS - 1 Work not conforming to approved documents
39558401R
Normalized: 039558401R
November 4, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39559114Z
Normalized: 039559114Z
November 18, 2026
10:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39559115K
Normalized: 039559115K
November 18, 2026
8:30 AM
CLASS - 2 DOB/OATH code-compliance issue
39559185X
Normalized: 039559185X
November 25, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance

How the summonses fit together at this property

This property has 5 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558396L — Work not conforming to approved documents

Normalized lookup key: 039558396L
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents.

Record context: source category Construction, severity CLASS - 1, issued August 26, 2026.

Full violation description from the source extract

DURING THE INSPECTION OF A 9STORY NB AT AN ACTIVE JOB SITE, IT WAS OBSERVED THAT TIMBER SOLDIER POSTS WITH 3 INCH TIMBER LAGGING, RAKERS WITH HEEL BLOCKS WERE NOT INSTALLED ACCORDING TO THE APPROVED SOE (SUPPO

Issue date
August 26, 2026
Served date
August 26, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning during the inspection of a 9story nb at an active job site, it was observed that timber soldier posts with 3 inch timber lagging, rakers with heel blocks were not installed according to the approved soe (suppo.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Violation 2

Summons 39558401R — DOB/OATH code-compliance issue

Normalized lookup key: 039558401R
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 1, issued August 26, 2026.

Full violation description from the source extract

AT THE TIME OF INSPECTION OF THE 9-STORY NEW BUILDING, I OBSERVED THAT THE EARTHWORK WAS COMPLETED. FURTHER RESEARCH OF THE DOB RECORDS SHOWED THAT NO NOTIFICATION OF COMMENCEMENT HAD BEEN PROVIDED TO THE DOB P

Issue date
August 26, 2026
Served date
August 26, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 111 — BC 3304.3,1 RCNY 52-01(A) FAIL TO NOTIFYDOB PRIOR TO COMMENCEMENT OF EARTHWORK

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT THE EARTHWORK WAS COMPLETED. FURTHER RESEARCH OF THE DOB RECORDS SHOWED THAT NO NOTIFICATION OF COMMENCEMENT HAD BEEN PROVIDED TO THE DOB P.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 3

Summons 39559114Z — DOB/OATH code-compliance issue

Normalized lookup key: 039559114Z
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Unknown, severity CLASS - 1, issued September 12, 2026.

Full violation description from the source extract

NOTE: AT THE TIME OF INSPECTION, AN INADEQUATE ROADWAY WORK/STORAGE ZONE WAS OBSERVED ADJACENT TO THE SIDEWALK WITH CONSTRUCTION MATERIALS AND MACHINERY NOT ENCLOSED WITH THE REQUIRED PROTECTIVE MEASURES AS PER

Issue date
September 12, 2026
Served date
September 12, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning note: at the time of inspection, an inadequate roadway work/storage zone was observed adjacent to the sidewalk with construction materials and machinery not enclosed with the required protective measures as per.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 4

Summons 39559115K — DOB/OATH code-compliance issue

Normalized lookup key: 039559115K
OATH hearingNovember 18, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Unknown, severity CLASS - 2, issued September 12, 2026.

Full violation description from the source extract

NOTE: AT TIME OF INSPECTION, I OBSERVED THAT THE SIDEWALK IS CLOSED, UPON REVIEWING DOT RECORDS IT WAS NOTED THAT NO PERMIT WAS ISSUED FOR THE SIDEWALK CLOSURE CONTRARY TO 3307.2.1. CREATING A HAZARD AND OBSTRU

Issue date
September 12, 2026
Served date
September 12, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT THE SIDEWALK IS CLOSED, UPON REVIEWING DOT RECORDS IT WAS NOTED THAT NO PERMIT WAS ISSUED FOR THE SIDEWALK CLOSURE CONTRARY TO 3307.2.1. CREATING A HAZARD AND OBSTRU.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 5

Summons 39559185X — Stop Work Order compliance

Normalized lookup key: 039559185X
OATH hearingNovember 25, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references Stop Work Order.

Specific record details: Stop Work Order. The description also references Stop Work Order COMP.

Full violation description from the source extract

@ACTIVE SITE IN 2ND FL STRUCTURE PHASE OBSERVE STREETS WORK&STORAGE ZONE IN USE W/ ADDITIONAL KNUCKLE BOOM TRUCK IN USE TO DELIVERY SITES STRUCTURAL RELATED MATERIAL NOT COMPLY WITH PARTIAL STOP WORK ORDER COMP

Issue date
September 15, 2026
Served date
September 15, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @active site in 2nd fl structure phase observe streets work&storage zone in use w/ additional knuckle boom truck in use to delivery sites structural related material not comply with partial stop work order comp.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Property-specific resolution support

How Building Violation LLC may help at 506 East 94 Street, Brooklyn, NY 11212

For 506 East 94 Street, Brooklyn, NY 11212, the current source extract points to work not conforming to approved documents, dob/oath code-compliance issue, stop work order compliance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.