November 2026 NYC DOB / ECB / OATH public-record review

525 Willoughby Avenue, Brooklyn, NY 11206 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 525 Willoughby Avenue, Brooklyn, NY 11206. The source records identify construction fence / site protection, sidewalk shed / temporary construction protection and a hearing date of November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protectionSidewalk shed / temporary construction protection

Property and hearing summary

Actual property address
525 Willoughby Avenue, Brooklyn, NY 11206
Borough
Brooklyn
BIN
3048823
BBL
3017590071 (3/1759/71)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
35730866N
Normalized: 035730866N
November 4, 2026
8:30 AM
CLASS - 2 Construction fence / site protection
35730867P
Normalized: 035730867P
November 4, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 35730866N — Construction fence / site protection

Normalized lookup key: 035730866N
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence.

Specific record details: construction fence.

Full violation description from the source extract

TEMPORARY CONTRUCTION EQUIPMENT ON SITE; EXPIRED PERMIT. NOTED AT THE TIME OF INSPECTION I OBSERVED THAT PERMIT FOR CONSTRUCTION FENCE HAD EXPIRED. I CHECKED ON THE SITE AND FOUND THAT NO PERMIT WAS DISPLAYED.

Issue date
August 31, 2026
Served date
August 31, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT PERMIT FOR CONSTRUCTION FENCE HAD EXPIRED. I CHECKED ON THE SITE AND FOUND THAT NO PERMIT WAS DISPLAYED.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Violation 2

Summons 35730867P — Sidewalk shed / temporary construction protection

Normalized lookup key: 035730867P
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

EXPIRED SIDEWALK SHED PERMIT. NOTED AT THE TIME OF INSPECTION I OBSERVED THAT PERMIT FOR SIDEWALK SHED HAD EXPIRED. I CHECKED ON THE SITE AND FOUND AN EXPIRED SIDEWALK SHED PERMIT. I THEN CHECKED THE BIS INTRAN

Issue date
August 31, 2026
Served date
August 31, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P8

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT PERMIT FOR SIDEWALK SHED HAD EXPIRED. I CHECKED ON THE SITE AND FOUND AN EXPIRED SIDEWALK SHED PERMIT. I THEN CHECKED THE BIS INTRAN.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 525 Willoughby Avenue, Brooklyn, NY 11206

For 525 Willoughby Avenue, Brooklyn, NY 11206, the current source extract points to construction fence / site protection, sidewalk shed / temporary construction protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.