The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 526 East 11 Street, Manhattan, NY 10009. The source records identify sidewalk shed / temporary construction protection, electrical work without a permit and a hearing date of November 12, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionElectrical work without a permit

Property and hearing summary

Actual property address
526 East 11 Street, Manhattan, NY 10009
Borough
Manhattan
BIN
1005130
BBL
1004040017 (1/404/17)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 12, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558836X
Normalized: 039558836X
November 12, 2026
9:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558837H
Normalized: 039558837H
November 12, 2026
10:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558838J
Normalized: 039558838J
November 12, 2026
8:30 AM
CLASS - 2 Electrical work without a permit

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (sidewalk shed), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558836X — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558836X
OATH hearingNovember 12, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

I OBSERVED A SIDEWALK SHED INSTALLED AT EXPO# 1 WITH MISSING INFORMATION PANEL AS REQUIRED BY CODE (3301.9.2) WHICH INCLUDES THE BUILDING ADDRESS AND NAME OF CONTRACTOR AND THE STATEMENT "FOR MORE INFO WITH THE

Issue date
September 7, 2026
Served date
September 7, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A SIDEWALK SHED INSTALLED AT EXPO# 1 WITH MISSING INFORMATION PANEL AS REQUIRED BY CODE (3301.9.2) WHICH INCLUDES THE BUILDING ADDRESS AND NAME OF CONTRACTOR AND THE STATEMENT "FOR MORE INFO WITH THE.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39558837H — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558837H
OATH hearingNovember 12, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed and exposure 1.

Specific record details: sidewalk shed, exposure 1.

Full violation description from the source extract

NOTE: AT TIME OF INSPECTION, I OBSERVED A SIDEWALK SHED INSTALL AT EXPOSURE# 1 WITH NO PERMIT POSTED IN A CONSPICUOUS PLACE, VISIBLE TO THE PUBLIC ANYWHERE ON THE BUILDING AS REQUIRED.

Issue date
September 7, 2026
Served date
September 7, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 220 — §28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A SIDEWALK SHED INSTALL AT EXPOSURE# 1 WITH NO PERMIT POSTED IN A CONSPICUOUS PLACE, VISIBLE TO THE PUBLIC ANYWHERE ON THE BUILDING AS REQUIRED.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 3

Summons 39558838J — Electrical work without a permit

Normalized lookup key: 039558838J
OATH hearingNovember 12, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references sidewalk shed, electrical wiring/equipment and exposure 1.

Specific record details: sidewalk shed, electrical wiring/equipment, exposure 1.

Full violation description from the source extract

NOTE: AT TIME OF INSPECTION, I OBSERVED A SIDEWALK SHED IN PLACE AT EXPOSURE#1 WITH ELECTRICAL LIGHTS INSTALLED ON THE UNDERSIDE OF THE SHED, UPON REVIEWING THE DEPARTMENT RECORD (BIS/DOBNOW) IT WAS FOUND THAT

Issue date
September 7, 2026
Served date
September 7, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A SIDEWALK SHED IN PLACE AT EXPOSURE#1 WITH ELECTRICAL LIGHTS INSTALLED ON THE UNDERSIDE OF THE SHED, UPON REVIEWING THE DEPARTMENT RECORD (BIS/DOBNOW) IT WAS FOUND THAT.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Property-specific resolution support

How Building Violation LLC may help at 526 East 11 Street, Manhattan, NY 10009

For 526 East 11 Street, Manhattan, NY 10009, the current source extract points to sidewalk shed / temporary construction protection, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.