November 2026 NYC DOB / ECB / OATH public-record review

550 61 Street, Brooklyn, NY 11220 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 550 61 Street, Brooklyn, NY 11220. The source records identify work not conforming to approved documents, dob/oath code-compliance issue and a hearing date of November 2, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work not conforming to approved documentsDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
550 61 Street, Brooklyn, NY 11220
Borough
Brooklyn
BIN
3143789
BBL
3057920027 (3/5792/27)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 2, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
35409029P
Normalized: 035409029P
November 2, 2026
1:00 PM
CLASS - 1 Work not conforming to approved documents
35409031Y
Normalized: 035409031Y
November 2, 2026
9:00 AM
CLASS - 1 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 35409029P — Work not conforming to approved documents

Normalized lookup key: 035409029P
OATH hearingNovember 2, 20261:00 PM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents.

Record context: source category Construction, severity CLASS - 1, issued July 23, 2025.

Full violation description from the source extract

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS. NOTED: AT THE TIME OF INSPECTION WE OBSERVED THAT THE SUBJECT RETAINING WALL SHOWN IN THE FILING BY BAYSIDE ENGINEERING(JOB #B01025469

Issue date
July 23, 2025
Served date
September 8, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 114 — 28-105.12.2 WK DOESN'T CONFORM TO APPRV CONST DOC/AMENDS IN MANUF DIST RES USE

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of inspection we observed that the subject retaining wall shown in the filing by bayside engineering(job #b01025469.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Violation 2

Summons 35409031Y — DOB/OATH code-compliance issue

Normalized lookup key: 035409031Y
OATH hearingNovember 2, 20269:00 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 1, issued July 23, 2025.

Full violation description from the source extract

COMPROMISED STRUCTURE, NEEDS TO BE DEMOLISHED AND REMOVED. NOTED: AT THE TIME OF INSPECTION WE NOTED THAT THE SUBJECT RETAINING WALL REPRESENT A SIGNIFICANT HAZARD TO PUBLIC SAFETY, IT IS UNSTABLE, AND ITS FOUN

Issue date
July 23, 2025
Served date
September 8, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 179 — AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of inspection we noted that the subject retaining wall represent a significant hazard to public safety, it is unstable, and its foun.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 550 61 Street, Brooklyn, NY 11220

For 550 61 Street, Brooklyn, NY 11220, the current source extract points to work not conforming to approved documents, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.