November 2026 NYC DOB / ECB / OATH public-record review

562 Lafayette Avenue, Brooklyn, NY 11205 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 562 Lafayette Avenue, Brooklyn, NY 11205. The source records identify construction fence / site protection, dob/oath code-compliance issue and a hearing date of November 25, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protectionDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
562 Lafayette Avenue, Brooklyn, NY 11205
Borough
Brooklyn
BIN
3049884
BBL
3017880042 (3/1788/42)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 25, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39559220M
Normalized: 039559220M
November 25, 2026
8:30 AM
CLASS - 2 Construction fence / site protection
39559221Y
Normalized: 039559221Y
November 25, 2026
9:30 AM
CLASS - 2 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39559220M — Construction fence / site protection

Normalized lookup key: 039559220M
OATH hearingNovember 25, 20268:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter.

Record context: source category Construction, severity CLASS - 2, issued September 16, 2026.

Full violation description from the source extract

UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. FENCE WAS NOT MAINTAINED IN SOUND CONDITION, GRAFFITI ON FENCE. FENCE DOES NOT FULLY ENCLOSE AND SECURE S

Issue date
September 16, 2026
Served date
September 16, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A FENCE INSTALLED AT EXPOS 1 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. FENCE WAS NOT MAINTAINED IN SOUND CONDITION, GRAFFITI ON FENCE. FENCE DOES NOT FULLY ENCLOSE AND SECURE S.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Violation 2

Summons 39559221Y — DOB/OATH code-compliance issue

Normalized lookup key: 039559221Y
OATH hearingNovember 25, 20269:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 2, issued September 16, 2026.

Full violation description from the source extract

UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH NO "NO SMOKING" SIGNS PROVIDED/INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF THE NEW YORK CITY FIRE CODE ON THE EXTERIOR AND INTERIOR OF THE FENCE C

Issue date
September 16, 2026
Served date
September 16, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2A9 — BC 3303.7.3 FAILURE TO POST NO SMOKING SIGNS AT CONST/DEMO SITE PER FIRE CODE

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A FENCE INSTALLED AT EXPOS 1 WITH NO "NO SMOKING" SIGNS PROVIDED/INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF THE NEW YORK CITY FIRE CODE ON THE EXTERIOR AND INTERIOR OF THE FENCE C.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 562 Lafayette Avenue, Brooklyn, NY 11205

For 562 Lafayette Avenue, Brooklyn, NY 11205, the current source extract points to construction fence / site protection, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.