Summons 39177148N — Boiler compliance
Normalized lookup key: 039177148NWhat DOB alleges
DOB alleges a boiler equipment or compliance condition. The inspector's description specifically references cellar and apartment S.
Specific record details: cellar, apartment S.
Full violation description from the source extract
CONTRARY TO DOB/OFFICIAL RECORDS (MDR # 211705), WHICH INDICATES 1 CELLAR APT, BOILER, STORAGE, METER RMS: AT TIME OF INSPECTION - 2 CELLAR APTS B1 & B2 WERE OBSERVED & CELLAR SOUTH AT EAST CONVERTED TO RECREAT
- Issue date
- February 12, 2026
- Served date
- February 12, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection 2 CELLAR APTS B1 & B2 WERE OBSERVED & CELLAR SOUTH AT EAST CONVERTED TO RECREAT.
What this violation means
This summons concerns boiler equipment, inspection/filing obligations or another boiler-safety requirement. The correct path depends on whether the issue is a physical equipment condition, a missed compliance filing, an unregistered device or a permit-related problem.
What may be required to correct the condition
Verify the boiler/device record and the exact compliance obligation. A qualified boiler professional may need to inspect or repair the equipment, complete the required DOB NOW: Safety filing, address civil penalties, or correct device/permit records before the violation can be resolved.
What the OATH hearing may involve
Useful hearing records may include the boiler inspection filing history, device status, repair records, proof of timely filing, and evidence showing whether the cited obligation applied during the relevant cycle.
Possible defenses or factual issues worth investigating
Determine whether the issue is physical, filing-based or registration/permit-based; verify the applicable cycle and device; and confirm any later accepted filing or correction.
Documents and evidence that may be useful
- DOB NOW boiler/device record
- inspection reports and accepted filings
- repair/service documentation
- permit or registration records
- proof of correction/payment/waiver where applicable