November 2026 NYC DOB / ECB / OATH public-record review

600-604 Trinity Avenue, Bronx, NY 10455 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 600-604 Trinity Avenue, Bronx, NY 10455. The source records identify boiler compliance, plumbing or gas work without a permit, work without a permit and a hearing date of November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Boiler compliancePlumbing or gas work without a permitWork without a permitElectrical work without a permit

Property and hearing summary

Actual property address
600-604 Trinity Avenue, Bronx, NY 10455
Borough
Bronx
BIN
2004419
BBL
2026230147 (2/2623/147)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39177148N
Normalized: 039177148N
November 24, 2026
8:30 AM
CLASS - 1 Boiler compliance
39177149P
Normalized: 039177149P
November 24, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit
39177150M
Normalized: 039177150M
November 24, 2026
8:30 AM
CLASS - 2 Work without a permit
39177151Y
Normalized: 039177151Y
November 24, 2026
8:30 AM
CLASS - 1 Electrical work without a permit

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39177148N — Boiler compliance

Normalized lookup key: 039177148N
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges a boiler equipment or compliance condition. The inspector's description specifically references cellar and apartment S.

Specific record details: cellar, apartment S.

Full violation description from the source extract

CONTRARY TO DOB/OFFICIAL RECORDS (MDR # 211705), WHICH INDICATES 1 CELLAR APT, BOILER, STORAGE, METER RMS: AT TIME OF INSPECTION - 2 CELLAR APTS B1 & B2 WERE OBSERVED & CELLAR SOUTH AT EAST CONVERTED TO RECREAT

Issue date
February 12, 2026
Served date
February 12, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection 2 CELLAR APTS B1 & B2 WERE OBSERVED & CELLAR SOUTH AT EAST CONVERTED TO RECREAT.

What this violation means

This summons concerns boiler equipment, inspection/filing obligations or another boiler-safety requirement. The correct path depends on whether the issue is a physical equipment condition, a missed compliance filing, an unregistered device or a permit-related problem.

What may be required to correct the condition

Verify the boiler/device record and the exact compliance obligation. A qualified boiler professional may need to inspect or repair the equipment, complete the required DOB NOW: Safety filing, address civil penalties, or correct device/permit records before the violation can be resolved.

What the OATH hearing may involve

Useful hearing records may include the boiler inspection filing history, device status, repair records, proof of timely filing, and evidence showing whether the cited obligation applied during the relevant cycle.

Possible defenses or factual issues worth investigating

Determine whether the issue is physical, filing-based or registration/permit-based; verify the applicable cycle and device; and confirm any later accepted filing or correction.

Documents and evidence that may be useful

  • DOB NOW boiler/device record
  • inspection reports and accepted filings
  • repair/service documentation
  • permit or registration records
  • proof of correction/payment/waiver where applicable
Violation 2

Summons 39177149P — Plumbing or gas work without a permit

Normalized lookup key: 039177149P
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references bathroom fixtures, kitchen, gas piping, plumbing lines/fixtures and apartment FOR.

Specific record details: bathroom fixtures, kitchen, gas piping, plumbing lines/fixtures, apartment FOR.

Full violation description from the source extract

W/O A PERMIT. NOTED: WATER & WASTE LINES INSTALLED AT ADDL'T APT FOR 3 PC BTHRM, RESIDENTIAL SINK AT KITCHEN AREA: AT REC RM FOR 2 PC BTHRM (TOILET, SINK) & WASHER IN GAS METER RM. GAS LINE INSTALLED FOR ADDLT

Issue date
February 12, 2026
Served date
February 12, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning water & waste lines installed at addl't apt for 3 pc bthrm, residential sink at kitchen area: at rec rm for 2 pc bthrm (toilet, sink) & washer in gas meter rm. gas line installed for addlt.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 3

Summons 39177150M — Work without a permit

Normalized lookup key: 039177150M
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references cellar, partition walls, bedroom(s), bathroom fixtures and apartment TO.

Specific record details: cellar, partition walls, bedroom(s), bathroom fixtures, apartment TO.

Full violation description from the source extract

W/O A PERMIT. NOTED: AT CELLAR - FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS - AT ADDL'T APT TO CREATE A BTHRM, CLOSETS & BDRMS: AT REC RM TO CREATE A BTHRM., OBTAIN ALL PERMITS

Issue date
February 12, 2026
Served date
February 12, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar - full height partition walls erected at various locations - at addl't apt to create a bthrm, closets & bdrms: at rec rm to create a bthrm.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 4

Summons 39177151Y — Electrical work without a permit

Normalized lookup key: 039177151Y
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references cellar and electrical wiring/equipment.

Specific record details: cellar, electrical wiring/equipment.

Full violation description from the source extract

W/O A PERMIT. NOTED: AT CELLAR - ELECTRICAL WIRING INSTALLED: 220V LINE FOR DRYER AT GAS METER RM; 110V LINES THROUGHOUT FOR ADDL'T LIGHTS, OUTLETS, SWITCHES IN REC RM, ADDL'T APT & FOR WASHER., OBTAIN PERMIT

Issue date
February 12, 2026
Served date
February 12, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar - electrical wiring installed: 220v line for dryer at gas meter rm; 110v lines throughout for addl't lights, outlets, switches in rec rm, addl't apt & for washer.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Property-specific resolution support

How Building Violation LLC may help at 600-604 Trinity Avenue, Bronx, NY 10455

For 600-604 Trinity Avenue, Bronx, NY 10455, the current source extract points to boiler compliance, plumbing or gas work without a permit, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.