November 2026 NYC DOB / ECB / OATH public-record review

607 East 2 Street, Brooklyn, NY 11218 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 607 East 2 Street, Brooklyn, NY 11218. The source records identify work without a permit, construction housekeeping / debris and a hearing date of November 6, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitConstruction housekeeping / debris

Property and hearing summary

Actual property address
607 East 2 Street, Brooklyn, NY 11218
Borough
Brooklyn
BIN
3126659
BBL
3053860059 (3/5386/59)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 6, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39183001J
Normalized: 039183001J
November 6, 2026
8:30 AM
CLASS - 1 Work without a permit
39183002L
Normalized: 039183002L
November 6, 2026
8:30 AM
CLASS - 1 Construction housekeeping / debris

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (rear yard), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39183001J — Work without a permit

Normalized lookup key: 039183001J
OATH hearingNovember 6, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references rear yard, rear area and exposure 3.

Specific record details: rear yard, rear area, exposure 3.

Full violation description from the source extract

WORK WITHOUT PERMIT. UNPERMITTED WORK OBSERVED: A 21 FT BY 20 FT EXTENSION IN THE REAR YARD, INCLUDING VERTICAL AND HORIZONTAL ELEVATIONS, CONSTRUCTED WITHOUT PROPER PERMITS AT EXPOSURE 3., OBTAIN PERMIT

Issue date
April 2, 2026
Served date
April 2, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without permit. unpermitted work observed: a 21 ft by 20 ft extension in the rear yard, including vertical and horizontal elevations, constructed without proper permits at exposure 3.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39183002L — Construction housekeeping / debris

Normalized lookup key: 039183002L
OATH hearingNovember 6, 20268:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references rear yard, rear area, debris/housekeeping and exposure 3.

Specific record details: rear yard, rear area, debris/housekeeping, exposure 3.

Full violation description from the source extract

FAILURE TO MAINTAIN. FAILURE TO MAINTAIN REAR YARD IN A CLEAN AND ORDERLY CONDITION. EXCESSIVE CONSTRUCTION DEBRIS OBSERVED AT EXPOSURE 3, INCLUDING 2X4 WOOD STUDS, PLYWOOD, ROOFING SHINGLES, STEEL WIRE MESH (2

Issue date
April 2, 2026
Served date
April 2, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain. failure to maintain rear yard in a clean and orderly condition. excessive construction debris observed at exposure 3, including 2x4 wood studs, plywood, roofing shingles, steel wire mesh (2.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 607 East 2 Street, Brooklyn, NY 11218

For 607 East 2 Street, Brooklyn, NY 11218, the current source extract points to work without a permit, construction housekeeping / debris. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.