November 2026 NYC DOB / ECB / OATH public-record review

61-65 Adrian Avenue, Manhattan, NY 10463 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 61-65 Adrian Avenue, Manhattan, NY 10463. The source records identify egress / fire-escape obstruction, structural or exterior maintenance and a hearing date of November 12, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Egress / fire-escape obstructionStructural or exterior maintenance

Property and hearing summary

Actual property address
61-65 Adrian Avenue, Manhattan, NY 10463
Borough
Manhattan
BIN
1064559
BBL
1022150276 (1/2215/276)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 12, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202973P
Normalized: 039202973P
November 12, 2026
8:30 AM
CLASS - 1 Egress / fire-escape obstruction
39202974R
Normalized: 039202974R
November 12, 2026
9:30 AM
CLASS - 2 Structural or exterior maintenance

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202973P — Egress / fire-escape obstruction

Normalized lookup key: 039202973P
OATH hearingNovember 12, 20268:30 AM

What DOB alleges

DOB alleges that a required exit, fire-escape or egress route was obstructed or otherwise noncompliant. The inspector's description specifically references fire escape and exposure 1.

Specific record details: fire escape, exposure 1.

Full violation description from the source extract

OBSERVED FLOWERPOTS AND AIR-CONDITIONING UNITS PLACED AND STORED ON THE FIRE ESCAPE AT EXPOSURE #1, OBSTRUCTING THE REQUIRED MEANS OF EGRESS., REMOVE OBSTRUCTION

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed flowerpots and air-conditioning units placed and stored on the fire escape at exposure #1, obstructing the required means of egress., remove obstruction.

What this violation means

DOB is alleging that required egress or a fire-escape route was obstructed or otherwise did not provide the required clear path. Egress conditions are life-safety issues and the exact route/location described matters.

What may be required to correct the condition

The cited path should be cleared or restored so required egress is unobstructed. If the issue involves construction, stairs, doors, fire escapes or layout rather than movable objects, professional review and permits may be needed before the condition can be considered corrected. Any correction should preserve the required egress route rather than simply moving the problem to another part of the exit system.

What the OATH hearing may involve

At OATH, photographs from the inspection date, floor/egress plans, evidence showing whether the obstruction existed, and proof of prompt correction can be relevant.

Possible defenses or factual issues worth investigating

Verify the exact egress route, whether the objects/condition actually reduced the required path, whether the cited area was a required exit component, and whether the condition had been corrected before or after service.

Documents and evidence that may be useful

  • dated photographs of the cited egress route
  • approved floor/egress plans where applicable
  • repair/removal records
  • inspection reports
  • proof of correction
Violation 2

Summons 39202974R — Structural or exterior maintenance

Normalized lookup key: 039202974R
OATH hearingNovember 12, 20269:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component.

Record context: source category Construction, severity CLASS - 2, issued September 3, 2026.

Full violation description from the source extract

OBSERVED FACADE SPALLING, PEELING PAINT, AND CRACKED/DETERIORATED STUCCO AT THE PARAPET LEVEL. DETERIORATED MORTAR JOINTS WERE OBSERVED AT EXPOSURES #1 AND #4., MAINTAIN EXTERIOR BUILDING WALL

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed facade spalling, peeling paint, and cracked/deteriorated stucco at the parapet level. deteriorated mortar joints were observed at exposures #1 and #4., maintain exterior building wall.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Property-specific resolution support

How Building Violation LLC may help at 61-65 Adrian Avenue, Manhattan, NY 10463

For 61-65 Adrian Avenue, Manhattan, NY 10463, the current source extract points to egress / fire-escape obstruction, structural or exterior maintenance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.