November 2026 NYC DOB / ECB / OATH public-record review

62-63 60 Street, Queens, NY 11385 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 62-63 60 Street, Queens, NY 11385. The source records identify construction fence / site protection, work without a permit and a hearing date of November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protectionWork without a permit

Property and hearing summary

Actual property address
62-63 60 Street, Queens, NY 11385
Borough
Queens
BIN
4083553
BBL
4034930015 (4/3493/15)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39203965J
Normalized: 039203965J
November 24, 2026
8:30 AM
CLASS - 2 Construction fence / site protection
39203966L
Normalized: 039203966L
November 24, 2026
9:30 AM
CLASS - 1 Work without a permit

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39203965J — Construction fence / site protection

Normalized lookup key: 039203965J
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references exposure 1.

Specific record details: exposure 1.

Full violation description from the source extract

ATOI OBSERVED AT EXPOSURE 1 OF SITE CONSTRUCTION TEMPORARY FENCE UNDER JOB#Q01413719 EXP DATE 01/07/2027 NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION 3307.7. NO 12 BY 12 VIEWING PANEL AND FENCE DOOR SWI

Issue date
September 14, 2026
Served date
September 14, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed at exposure 1 of site construction temporary fence under job#q01413719 exp date 01/07/2027 not constructed or maintained pursuant to subsection 3307.7. no 12 by 12 viewing panel and fence door swi.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Violation 2

Summons 39203966L — Work without a permit

Normalized lookup key: 039203966L
OATH hearingNovember 24, 20269:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references dwelling/occupancy configuration and exposure 1.

Specific record details: dwelling/occupancy configuration, exposure 1.

Full violation description from the source extract

ATOI OBSERVED AT EXPOSURE 1,2, AND 4 ILLEGAL ENCLOSED VERTICAL HORIZONTAL EXTENSION AND EXTENDING PARAPET WALL ABOVE A 2 STORY FAMILY DWELLING. ILLEGAL STRUCTURES CONSIST OF EXTERIOR WATERPROOF BOARD, WINDOWS A

Issue date
September 14, 2026
Served date
September 14, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed at exposure 1,2, and 4 illegal enclosed vertical horizontal extension and extending parapet wall above a 2 story family dwelling. illegal structures consist of exterior waterproof board, windows a.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Property-specific resolution support

How Building Violation LLC may help at 62-63 60 Street, Queens, NY 11385

For 62-63 60 Street, Queens, NY 11385, the current source extract points to construction fence / site protection, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.