November 2026 NYC DOB / ECB / OATH public-record review

622 East 223 Street, Bronx, NY 10466 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 622 East 223 Street, Bronx, NY 10466. The source records identify construction housekeeping / debris, sidewalk shed / temporary construction protection and a hearing date of November 20, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction housekeeping / debrisSidewalk shed / temporary construction protection

Property and hearing summary

Actual property address
622 East 223 Street, Bronx, NY 10466
Borough
Bronx
BIN
2062904
BBL
2048240049 (2/4824/49)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 20, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39559098H
Normalized: 039559098H
November 20, 2026
9:30 AM
CLASS - 2 Construction housekeeping / debris
39559100H
Normalized: 039559100H
November 20, 2026
10:30 AM
CLASS - 1 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39559098H — Construction housekeeping / debris

Normalized lookup key: 039559098H
OATH hearingNovember 20, 20269:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping and exposure 1.

Specific record details: debris/housekeeping, exposure 1.

Full violation description from the source extract

DURING MY INSPECTION OF A CLOSED 4-STORY NB. I OBSERVED NO ACTIVE CONSTRUCTION WORK; ONE DEBRIS CONTAINER IN PLACE AT ROADWAY EXPOSURE 1, PARTIALLY FILLED; NO TARP ON TOP; UNCOVERED, NOT MAINTAINED AS PER CODE

Issue date
September 12, 2026
Served date
September 12, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed NO ACTIVE CONSTRUCTION WORK; ONE DEBRIS CONTAINER IN PLACE AT ROADWAY EXPOSURE 1, PARTIALLY FILLED; NO TARP ON TOP; UNCOVERED, NOT MAINTAINED AS PER CODE.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 2

Summons 39559100H — Sidewalk shed / temporary construction protection

Normalized lookup key: 039559100H
OATH hearingNovember 20, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed and debris/housekeeping.

Specific record details: sidewalk shed, debris/housekeeping.

Full violation description from the source extract

DURING MY INSPECTION OF A CLOSED SITE. I OBSERVED EXPOSURE ONE BEING USED AS A WORK AND STORAGE ZONE, WITH A DEBRIS CONTAINER PLACED CURBSIDE NEAR THE OUTER SIDEWALK SHED AND PEDESTRIAN PATHWAY. NO 4-FOOT-HIGH

Issue date
September 12, 2026
Served date
September 12, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1E7 — BC3307.3 FAILURE TO PROVIDE PEDESTRAIN PROTECTION FOR SIDEWALKS AND WALKWAYS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed EXPOSURE ONE BEING USED AS A WORK AND STORAGE ZONE, WITH A DEBRIS CONTAINER PLACED CURBSIDE NEAR THE OUTER SIDEWALK SHED AND PEDESTRIAN PATHWAY. NO 4-FOOT-HIGH.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 622 East 223 Street, Bronx, NY 10466

For 622 East 223 Street, Bronx, NY 10466, the current source extract points to construction housekeeping / debris, sidewalk shed / temporary construction protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.