November 2026 NYC DOB / ECB / OATH public-record review

680-682 Lorimer Street, Brooklyn, NY 11211 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 680-682 Lorimer Street, Brooklyn, NY 11211. The source records identify construction-site safety and a hearing date of November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction-site safety

Property and hearing summary

Actual property address
680-682 Lorimer Street, Brooklyn, NY 11211
Borough
Brooklyn
BIN
3068149
BBL
3027370005 (3/2737/5)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39541992R
Normalized: 039541992R
November 17, 2026
8:30 AM
CLASS - 2 Construction-site safety

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns construction-site safety; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39541992R — Construction-site safety

Normalized lookup key: 039541992R
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency.

Record context: source category Unknown, severity CLASS - 2, issued July 5, 2025.

Full violation description from the source extract

BC3303.3 WATCHPERSON. OBSERVED 7 STORY NEW BUILDING, BUILDING APPROXIMATELY 6612 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALE

Issue date
July 5, 2025
Served date
July 5, 2025
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning bc3303.3 watchperson. observed 7 story new building, building approximately 6612 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to ale.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Property-specific resolution support

How Building Violation LLC may help at 680-682 Lorimer Street, Brooklyn, NY 11211

For 680-682 Lorimer Street, Brooklyn, NY 11211, the current source extract points to construction-site safety. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.