November 2026 NYC DOB / ECB / OATH public-record review

707-713 West 179 Street, Manhattan, NY 10033 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 707-713 West 179 Street, Manhattan, NY 10033. The source records identify construction fence / site protection and a hearing date of November 5, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protection

Property and hearing summary

Actual property address
707-713 West 179 Street, Manhattan, NY 10033
Borough
Manhattan
BIN
1064261
BBL
1021760027 (1/2176/27)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 5, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558633X
Normalized: 039558633X
November 5, 2026
10:30 AM
CLASS - 2 Construction fence / site protection
39558634H
Normalized: 039558634H
November 5, 2026
10:30 AM
CLASS - 2 Construction fence / site protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558633X — Construction fence / site protection

Normalized lookup key: 039558633X
OATH hearingNovember 5, 202610:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence.

Specific record details: construction fence.

Full violation description from the source extract

OBS. 2-STY BLDG W/ TEMP. CONSTRUCTION FENCE IN PLACE AT EXP. 1. DOB RECORDS INDICATE FENCE PERMIT EXPIRED 6/16/26 W/ NO RENEWAL IN PROGRESS. TEMP. CONSTRUCTION EQUIP. REMAINED IN PLACE/USAGE AFTER PERMIT EXPIRA

Issue date
August 29, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning obs. 2-sty bldg w/ temp. construction fence in place at exp. 1. DOB records indicate fence permit expired 6/16/26 w/ no renewal in progress. temp. construction equip. remained in place/usage after permit expira.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Violation 2

Summons 39558634H — Construction fence / site protection

Normalized lookup key: 039558634H
OATH hearingNovember 5, 202610:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter.

Record context: source category Construction, severity CLASS - 2, issued August 29, 2026.

Full violation description from the source extract

OBS. JOB FENCE AT EXP. 1 NOT PROPERLY MAINTAINED. FENCE PANELS LOOSE/BULGING W/GAPS, DAMAGED/MISSING PLEXIGLASS/VIEWING PANELS, PROTRUDING NAILS/FASTENERS, GRAFFITI/POSTER REMNANTS & MISSING REQ'D INFO/SIGNAGE.

Issue date
August 29, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning obs. job fence at exp. 1 not properly maintained. fence panels loose/bulging w/gaps, damaged/missing plexiglass/viewing panels, protruding nails/fasteners, graffiti/poster remnants & missing req'd info/signage.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Property-specific resolution support

How Building Violation LLC may help at 707-713 West 179 Street, Manhattan, NY 10033

For 707-713 West 179 Street, Manhattan, NY 10033, the current source extract points to construction fence / site protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.