Summons 39204275R — Construction housekeeping / debris
Normalized lookup key: 039204275RWhat DOB alleges
DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping.
Specific record details: debris/housekeeping.
Full violation description from the source extract
NOTED: ECB VIOLATION ISSUED FOR FTM DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP AT EXPO 3 OF THE RESIDENT . CONSISTING OF LARGE PILES OF PLASTIC BAGS FULL OF CONST
- Issue date
- September 16, 2026
- Served date
- September 16, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning ecb violation issued for ftm due to excessive debris. atoi observed an excessive amount of construction debris piled up at expo 3 of the resident . consisting of large piles of plastic bags full of const.
What this violation means
The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.
What may be required to correct the condition
Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.
What the OATH hearing may involve
Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.
Possible defenses or factual issues worth investigating
Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.
Documents and evidence that may be useful
- dated photographs
- site-safety or housekeeping logs
- hauling/disposal receipts
- contractor records
- proof of correction