November 2026 NYC DOB / ECB / OATH public-record review

72-02-72-08 62 Street, Queens, NY 11385 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 72-02-72-08 62 Street, Queens, NY 11385. The source records identify electrical work without a permit, stop work order compliance and hearing dates on November 10, 2026 and November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Electrical work without a permitStop Work Order compliance

Property and hearing summary

Actual property address
72-02-72-08 62 Street, Queens, NY 11385
Borough
Queens
BIN
4434809
BBL
4035920011 (4/3592/11)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 10, 2026, November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39201666K
Normalized: 039201666K
November 10, 2026
8:30 AM
CLASS - 2 Electrical work without a permit
39203700Y
Normalized: 039203700Y
November 17, 2026
10:30 AM
CLASS - 1 Stop Work Order compliance

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39201666K — Electrical work without a permit

Normalized lookup key: 039201666K
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references second floor and electrical wiring/equipment.

Specific record details: second floor, electrical wiring/equipment. The description also references Stop Work Order AND.

Full violation description from the source extract

PSWO AND ECB VIOLATION ISSUED FOR ELECTRICAL WORK W/O PERMIT. OBSERVED AT 2ND FLOOR THE INSTALLATION OF NEW CABLES/BOXES IN CEILING AND WALLS FOR LIGHTS, SWITCHES AND OUTLETS. ALSO NEW PANEL BOX INSTALLED. STOP

Issue date
August 24, 2026
Served date
August 25, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
ADMIT/IN-VIO
Infraction / law references in source extract:
  • 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning pswo and ECB violation issued for electrical work without permit. observed at 2nd floor the installation of new cables/boxes in ceiling and walls for lights, switches and outlets. also new panel box installed. stop.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 2

Summons 39203700Y — Stop Work Order compliance

Normalized lookup key: 039203700Y
OATH hearingNovember 17, 202610:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references second floor and electrical wiring/equipment.

Specific record details: second floor, electrical wiring/equipment. The description also references Stop Work Order WAS.

Full violation description from the source extract

ATOI OBSERVED PSWO WAS REMOVED FROM ENTRY DOOR WHICH WAS POSTED ON 08-24-2026 FOR ELECTRICAL WORK ON 2ND FLOOR., COMPLY WITH CODE

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed pswo was removed from entry door which was posted on 08-24-2026 for electrical work on 2nd floor.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Property-specific resolution support

How Building Violation LLC may help at 72-02-72-08 62 Street, Queens, NY 11385

For 72-02-72-08 62 Street, Queens, NY 11385, the current source extract points to electrical work without a permit, stop work order compliance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.