November 2026 NYC DOB / ECB / OATH public-record review

724 East 5 Street, Brooklyn, NY 11218 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 724 East 5 Street, Brooklyn, NY 11218. The source records identify electrical work without a permit, certificate of correction / compliance filing and hearing dates on November 18, 2026 and November 25, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Electrical work without a permitCertificate of Correction / compliance filing

Property and hearing summary

Actual property address
724 East 5 Street, Brooklyn, NY 11218
Borough
Brooklyn
BIN
3127153
BBL
3053980030 (3/5398/30)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 18, 2026, November 25, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39203011Z
Normalized: 039203011Z
November 18, 2026
10:30 AM
CLASS - 1 Electrical work without a permit
39204003N
Normalized: 039204003N
November 25, 2026
10:30 AM
CLASS - 2 Certificate of Correction / compliance filing

How the summonses fit together at this property

At least one summons concerns failure to file or obtain acceptance of a Certificate of Correction. That later compliance issue should be cross-checked against the underlying summons it references; paying or resolving one record does not automatically establish that the other record is closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39203011Z — Electrical work without a permit

Normalized lookup key: 039203011Z
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment.

Full violation description from the source extract

ATOI, AT 11:55 AM. OBSERVED FROM THE EXTERIOR AT EXPO #2 AN AC UNIT INSTALLED WITHOUT THE REQUIRED ELECTRICAL PERMIT,THE WORK WAS 100% COMPLETE., OBTAIN PERMIT

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi, at 11:55 am. observed from the exterior at expo #2 an ac unit installed without the required electrical permit,the work was 100% complete.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 2

Summons 39204003N — Certificate of Correction / compliance filing

Normalized lookup key: 039204003N
OATH hearingNovember 25, 202610:30 AM

What DOB alleges

DOB alleges that a required Certificate of Correction was not filed or accepted for an earlier summons. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction.

Full violation description from the source extract

AT TIME OF INSPECTION, OBSERVED CERTIFICATE OF CORRECTION FILED WITH DOB FOR OATH #39109012J ISSUED 08/15/2023 WAS DISAPPROVED., FILE A CERTIFICATE OF CORRECTION; FILE FOR CERTIFICATE OF CORRECTION

Issue date
September 14, 2026
Served date
September 14, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED CERTIFICATE OF CORRECTION FILED WITH DOB FOR OATH #39109012J ISSUED 08/15/2023 WAS DISAPPROVED., FILE A CERTIFICATE OF CORRECTION; FILE FOR CERTIFICATE OF CORRECTION.

What this violation means

This summons alleges failure to comply with a prior Commissioner's order by filing an acceptable Certificate of Correction for an earlier summons. The underlying violation and the later compliance summons are separate records that should be tracked together.

What may be required to correct the condition

First identify the underlying summons referenced in the description and verify whether the physical condition was corrected, whether a Certificate of Correction was submitted, and its current DOB status. If correction is still outstanding, the underlying condition generally has to be addressed before an acceptable certification package can be completed.

What the OATH hearing may involve

The hearing may turn on the status of the underlying summons, the order to certify correction, the timing and adequacy of any submission, and whether DOB records show an accepted, rejected or missing Certificate of Correction.

Possible defenses or factual issues worth investigating

Verify the underlying summons number, correction deadline/order, any prior Certificate of Correction request, disapproval reason, and whether later agency activity changed the status. Do not assume payment of an OATH penalty closed the DOB correction requirement.

Documents and evidence that may be useful

  • copy/status of the underlying summons
  • Certificate of Correction submission and DOB response
  • proof of physical correction such as photographs, receipts or permits
  • DOB NOW/BIS status records
  • OATH disposition and payment records if relevant
Property-specific resolution support

How Building Violation LLC may help at 724 East 5 Street, Brooklyn, NY 11218

For 724 East 5 Street, Brooklyn, NY 11218, the current source extract points to electrical work without a permit, certificate of correction / compliance filing. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.