November 2026 NYC DOB / ECB / OATH public-record review

75 South 8 Street, Brooklyn, NY 11249 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 75 South 8 Street, Brooklyn, NY 11249. The source records identify stop work order compliance and hearing dates on November 18, 2026 and November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Stop Work Order compliance

Property and hearing summary

Actual property address
75 South 8 Street, Brooklyn, NY 11249
Borough
Brooklyn
BIN
3418167
BBL
3021307502 (3/2130/7502)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 18, 2026, November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
35728381M
Normalized: 035728381M
November 4, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance
39201849N
Normalized: 039201849N
November 4, 2026
9:30 AM
CLASS - 1 Stop Work Order compliance
39202023L
Normalized: 039202023L
November 4, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance
39203672X
Normalized: 039203672X
November 18, 2026
9:30 AM
CLASS - 1 Stop Work Order compliance

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Several descriptions point to the same area (roof), which is a sign the summonses may be factually connected. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 35728381M — Stop Work Order compliance

Normalized lookup key: 035728381M
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references roof, scaffold/shoring and Stop Work Order.

Specific record details: roof, scaffold/shoring, Stop Work Order. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

UNLAWFUULY CONTINUED WORK WHILE ON NOTICE OR STOP WORK ORDER. ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS ON ADDITION TO ROOF. WORKERS WORKING ON SUSPENDED SCAFFOLD. ALL IN VIOLATION OF PSWO ISSUED ON 8/12/2026

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawfuuly continued work while on notice or stop work order. atoi observed construction work in progress on addition to roof. workers working on suspended scaffold. all in violation of pswo issued on 8/12/2026.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 2

Summons 39201849N — Stop Work Order compliance

Normalized lookup key: 039201849N
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references roof and Stop Work Order.

Specific record details: roof, Stop Work Order. The description also references Stop Work Order WAS.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED TWO MALE WORKERS WORKING ON ROOF EXTENSION. ACTIVE STOP WORK ORDER WAS ISSUED ON 8/19/2026., COMPLY WITH STOP WORK ORDER

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED TWO MALE WORKERS WORKING ON ROOF EXTENSION. ACTIVE STOP WORK ORDER WAS ISSUED ON 8/19/2026., COMPLY WITH STOP WORK ORDER.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 3

Summons 39202023L — Stop Work Order compliance

Normalized lookup key: 039202023L
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references roof, Stop Work Order and exposure 1.

Specific record details: roof, Stop Work Order, exposure 1. The description also references Stop Work Order SINCE.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED SEVERAL PUMP JACK SCAFFOLDING INSTALLED ON TOP OF ROOF AT EXPOSURE 1, USING STANDARD LADDERS AS PLATFORMS. THERE IS ACTIVE STOP WORK ORDER SINCE 8/12/2026., COMPLY WITH STOP WORK

Issue date
August 26, 2026
Served date
August 26, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED SEVERAL PUMP JACK SCAFFOLDING INSTALLED ON TOP OF ROOF AT EXPOSURE 1, USING STANDARD LADDERS AS PLATFORMS. THERE IS ACTIVE STOP WORK ORDER SINCE 8/12/2026., COMPLY WITH STOP WORK.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 4

Summons 39203672X — Stop Work Order compliance

Normalized lookup key: 039203672X
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references Stop Work Order.

Specific record details: Stop Work Order. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

UNLAWFUL CONTINUANCE OF WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED ON 8/12/2026 VIO #039200329P. ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS WITH SEVERAL WORKERS THROUGHOUT THE 5TH, 6TH AND 7TH FLOORS OF

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawful continuance of work while on notice of a stop work order issued on 8/12/2026 vio #039200329p. atoi observed construction work in progress with several workers throughout the 5th, 6th and 7th floors of.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Property-specific resolution support

How Building Violation LLC may help at 75 South 8 Street, Brooklyn, NY 11249

For 75 South 8 Street, Brooklyn, NY 11249, the current source extract points to stop work order compliance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.