Summons 37036643Z — Structural or exterior maintenance
Normalized lookup key: 037036643ZWhat DOB alleges
DOB alleges a maintenance or safety defect involving a structural/exterior building component.
Record context: source category Local Law, severity CLASS - 2, issued April 20, 2026.
Full violation description from the source extract
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #913822. AGG1: PRIOR NOV 37026744Z UNDER 28-302
- Issue date
- April 20, 2026
- Served date
- May 21, 2026
- Source violation type
- Local Law
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 227 — 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #913822. agg1: prior nov 37026744z under 28-302.
What this violation means
This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.
What may be required to correct the condition
The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.
What the OATH hearing may involve
The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.
Possible defenses or factual issues worth investigating
Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.
Documents and evidence that may be useful
- dated photographs
- architect/engineer reports if structural issues are involved
- repair contracts/invoices
- permits and inspection records
- maintenance or prior repair records