November 2026 NYC DOB / ECB / OATH public-record review

84 Dean Street, Brooklyn, NY 11201 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 84 Dean Street, Brooklyn, NY 11201. The source records identify construction housekeeping / debris, sidewalk shed / temporary construction protection, fire-safety condition and a hearing date of November 23, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction housekeeping / debrisSidewalk shed / temporary construction protectionFire-safety conditionConstruction fence / site protection

Property and hearing summary

Actual property address
84 Dean Street, Brooklyn, NY 11201
Borough
Brooklyn
BIN
3001244
BBL
3001940011 (3/194/11)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 23, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39556696Y
Normalized: 039556696Y
November 23, 2026
8:30 AM
CLASS - 1 Construction housekeeping / debris
39556697X
Normalized: 039556697X
November 23, 2026
8:30 AM
CLASS - 1 Sidewalk shed / temporary construction protection
39556698H
Normalized: 039556698H
November 23, 2026
8:30 AM
CLASS - 1 Fire-safety condition
39556699J
Normalized: 039556699J
November 23, 2026
8:30 AM
CLASS - 2 Construction fence / site protection

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39556696Y — Construction housekeeping / debris

Normalized lookup key: 039556696Y
OATH hearingNovember 23, 20268:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping and exposure 1, 2.

Specific record details: debris/housekeeping, exposure 1, 2.

Full violation description from the source extract

@PERMITTED SITE IN STRUCTURE PHASE OBSERVE SITES CONCRETE DEBRIS FROM COLUMNS POUR ALONG EXP#2/4 DROPPED ONTO ADJOIN NEIGHBOR PROPERTIES AND DAMAGING THEIR PROPERTY AT EXPOSURE#1 WITHOUT ADEQUATE SAFETY MEASURE

Issue date
July 16, 2026
Served date
July 16, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @permitted site in structure phase observe sites concrete debris from columns pour along exp#2/4 dropped onto adjoin neighbor properties and damaging their property at exposure#1 without adequate safety measure.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 2

Summons 39556697X — Sidewalk shed / temporary construction protection

Normalized lookup key: 039556697X
OATH hearingNovember 23, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

@PERMITTED SITE WITH FINISH HEIGHT OF 49FT OBSERVE SITES IN STRUCTURE PHASE UP TO 3RD FL@28'-8" IN HEIGHT W/ ONLY 6' 9 3/4" DISTANCE FROM SITE TO FENCE&NO SIDEWALK SHED IN PLACE TO CODE BC3307.6.2(2.) TO PROTEC

Issue date
July 16, 2026
Served date
July 16, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @permitted site with finish height of 49ft observe sites in structure phase up to 3rd fl@28'-8" in height w/ only 6' 9 3/4" distance from site to fence&no sidewalk shed in place to code bc3307.6.2(2.) to protec.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 3

Summons 39556698H — Fire-safety condition

Normalized lookup key: 039556698H
OATH hearingNovember 23, 20268:30 AM

What DOB alleges

DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references combustible materials and debris/housekeeping.

Specific record details: combustible materials, debris/housekeeping.

Full violation description from the source extract

@PERMITTED SITE OBSERVE PILES OF CONSTRUCTION DEBRIS NOT STORED IN NON-COMBUSTIBLE CONTAINER, MATERIAL/DEBRIS+COMBUSTIBLE/STORED WITHIN 10FT OF UNCLOSED PERIMETER NOT REMOVED FROM SITE CREATING UNSAFE(DISLODGME

Issue date
July 16, 2026
Served date
July 16, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @permitted site observe piles of construction debris not stored in non-combustible container, material/debris+combustible/stored within 10ft of unclosed perimeter not removed from site creating unsafe(dislodgme.

What this violation means

DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.

What may be required to correct the condition

The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed.

What the OATH hearing may involve

Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.

Possible defenses or factual issues worth investigating

Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required.

Documents and evidence that may be useful

  • dated photographs
  • fire-protection/system records where relevant
  • repair/removal invoices
  • approved plans if rated construction or equipment is involved
  • proof of correction
Violation 4

Summons 39556699J — Construction fence / site protection

Normalized lookup key: 039556699J
OATH hearingNovember 23, 20268:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter.

Record context: source category Construction, severity CLASS - 2, issued July 16, 2026.

Full violation description from the source extract

@PERMITTED SITE OBSERVE JOB FENCE IN PLACE WITHOUT A SINGLE VIEWING PANEL TO CODE BC3307.7.3 TO ASSIST IN SITE ASSESSMENT+EMERGENCY OPERATIONS AFFECTING HEALTH&LIFE SAFETY.

Issue date
July 16, 2026
Served date
July 16, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning @permitted site observe job fence in place without a single viewing panel to code bc3307.7.3 to assist in site assessment+emergency operations affecting health&life safety.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Property-specific resolution support

How Building Violation LLC may help at 84 Dean Street, Brooklyn, NY 11201

For 84 Dean Street, Brooklyn, NY 11201, the current source extract points to construction housekeeping / debris, sidewalk shed / temporary construction protection, fire-safety condition. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.