Summons 39190876H — Stop Work Order compliance
Normalized lookup key: 039190876HWhat DOB alleges
DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references dwelling/occupancy configuration.
Specific record details: dwelling/occupancy configuration.
Full violation description from the source extract
VIOLATION ISSUED ON 02/10/26 FOR COMPLAINT #4A24805, STATES THAT WORK 75% COMPLETE; HOWEVER, ATOI WORK APPEARS TO BE 100% COMPLETE, AND BOTH DWELLING UNITS IN BUILDING ARE OCCUPIED. VIOLATION ISSUED FOR WORK WH
- Issue date
- June 2, 2026
- Served date
- June 2, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning violation issued on 02/10/26 for complaint #4a24805, states that work 75% complete; however, atoi work appears to be 100% complete, and both dwelling units in building are occupied. violation issued for work wh.
What this violation means
The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.
What may be required to correct the condition
Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.
What the OATH hearing may involve
Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.
Possible defenses or factual issues worth investigating
Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active.
Documents and evidence that may be useful
- Stop Work Order and related DOB inspection records
- permits and approved plans
- site photographs and daily logs
- rescind/partial-rescind correspondence or approvals
- contractor and site-safety records