November 2026 NYC DOB / ECB / OATH public-record review

87-32 168 Place, Queens, NY 11432 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 87-32 168 Place, Queens, NY 11432. The source records identify work without a permit and a hearing date of November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permit

Property and hearing summary

Actual property address
87-32 168 Place, Queens, NY 11432
Borough
Queens
BIN
4210521
BBL
4098400044 (4/9840/44)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39174554P
Normalized: 039174554P
November 17, 2026
8:30 AM
CLASS - 2 Work without a permit

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns work without a permit; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39174554P — Work without a permit

Normalized lookup key: 039174554P
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references front area, partition walls and lighting/illumination.

Specific record details: front area, partition walls, lighting/illumination.

Full violation description from the source extract

RCA ISSUED 08/02/24 BY BADGE #3440 & NOT CORRECTED, WORK W/OUT PERMIT FRONT PORCH ERECTED FULL HEIGHT PARTITION WITH EXTERIOR ENTRY & INSTALLED 3 WINDOWS ENCLOSING PORCH AREA, INSTALLED RECESSED LIGHTING AT SOF

Issue date
January 21, 2026
Served date
January 21, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning rca issued 08/02/24 by badge #3440 & not corrected, work w/out permit front porch erected full height partition with exterior entry & installed 3 windows enclosing porch area, installed recessed lighting at sof.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Property-specific resolution support

How Building Violation LLC may help at 87-32 168 Place, Queens, NY 11432

For 87-32 168 Place, Queens, NY 11432, the current source extract points to work without a permit. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.