November 2026 NYC DOB / ECB / OATH public-record review

90-16 195 Street, Queens, NY 11423 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 90-16 195 Street, Queens, NY 11423. The source records identify construction fence / site protection and a hearing date of November 16, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protection

Property and hearing summary

Actual property address
90-16 195 Street, Queens, NY 11423
Borough
Queens
BIN
4222292
BBL
4104580014 (4/10458/14)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 16, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39187667Y
Normalized: 039187667Y
November 16, 2026
8:30 AM
CLASS - 2 Construction fence / site protection

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns construction fence / site protection; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39187667Y — Construction fence / site protection

Normalized lookup key: 039187667Y
OATH hearingNovember 16, 20268:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter.

Record context: source category Construction, severity CLASS - 2, issued May 7, 2026.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED FENCE NOT BEING MAINTAINED PER CODE. FENCE IS BOWING/LEANING AS WELL AS MISSING ADDITIONAL VIEWPORTS FROM FENCE. ECB ISSUED AS PUBLIC SAFETY IS NOT MAINTAINED., COMPLY WITH CODE

Issue date
May 7, 2026
Served date
May 7, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED FENCE NOT BEING MAINTAINED PER CODE. FENCE IS BOWING/LEANING AS WELL AS MISSING ADDITIONAL VIEWPORTS FROM FENCE. ECB ISSUED AS PUBLIC SAFETY IS NOT MAINTAINED.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Property-specific resolution support

How Building Violation LLC may help at 90-16 195 Street, Queens, NY 11423

For 90-16 195 Street, Queens, NY 11423, the current source extract points to construction fence / site protection. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.