November 2026 NYC DOB / ECB / OATH public-record review

94 Starr Street, Brooklyn, NY 11237 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 94 Starr Street, Brooklyn, NY 11237. The source records identify plumbing or gas work without a permit, egress / fire-escape obstruction, electrical work without a permit and a hearing date of November 13, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Plumbing or gas work without a permitEgress / fire-escape obstructionElectrical work without a permit

Property and hearing summary

Actual property address
94 Starr Street, Brooklyn, NY 11237
Borough
Brooklyn
BIN
3072731
BBL
3031970020 (3/3197/20)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 13, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39168633M
Normalized: 039168633M
November 13, 2026
9:00 AM
CLASS - 1 Plumbing or gas work without a permit
39168634Y
Normalized: 039168634Y
November 13, 2026
9:00 AM
CLASS - 1 Plumbing or gas work without a permit
39168635X
Normalized: 039168635X
November 13, 2026
9:00 AM
CLASS - 1 Egress / fire-escape obstruction
39168636H
Normalized: 039168636H
November 13, 2026
9:00 AM
CLASS - 1 Electrical work without a permit

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39168633M — Plumbing or gas work without a permit

Normalized lookup key: 039168633M
OATH hearingNovember 13, 20269:00 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, partition walls, bathroom fixtures and Class A residential occupancy.

Specific record details: cellar, partition walls, bathroom fixtures, Class A residential occupancy.

Full violation description from the source extract

3 STORY NFP BUILDING WITH CELLAR. OBSERVED FULL HEIGHT PARTITION ERECTED FOR CLASS A APARTMENT WITH BATHROOM. NO PERMIT ON RECORD FOR THIS WORK ATOI., OBTAIN PERMIT

Issue date
November 28, 2025
Served date
November 28, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning 3 story nfp building with cellar. observed full height partition erected for class a apartment with bathroom. no permit on record for this work atoi.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 2

Summons 39168634Y — Plumbing or gas work without a permit

Normalized lookup key: 039168634Y
OATH hearingNovember 13, 20269:00 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, bathroom fixtures, kitchen and plumbing lines/fixtures.

Specific record details: cellar, bathroom fixtures, kitchen, plumbing lines/fixtures.

Full violation description from the source extract

. 3 STORY NFP BUILDING WITH CELLAR. OBSERVED AT CELLAR WITH 3 PEACE BATHROOM INSTALLED AND CONNECTIONS FOR KITCHEN SINK. ALOS OBSERVED PLUMBING FOR WASHER AND DRYER. NO PERMIT ON RECORD ATOI FOR THIS WORK., OBT

Issue date
November 28, 2025
Served date
November 28, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning 3 story nfp building with cellar. observed at cellar with 3 peace bathroom installed and connections for kitchen sink. alos observed plumbing for washer and dryer. no permit on record atoi for this work., obt.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 3

Summons 39168635X — Egress / fire-escape obstruction

Normalized lookup key: 039168635X
OATH hearingNovember 13, 20269:00 AM

What DOB alleges

DOB alleges that a required exit, fire-escape or egress route was obstructed or otherwise noncompliant. The inspector's description specifically references cellar and Class A residential occupancy.

Specific record details: cellar, Class A residential occupancy.

Full violation description from the source extract

3 STORY NFP BUILDING. OBSERVED AT CELLAR LEVEL ILLEGAL CLASS A APARTMENT WITH NO SECONDARY MEANS OF EGRESS AND BELCO DOOR LOCK FROM INSIDE WITH LADDER BLOCKING STEPS., COMPLY WITH CODE

Issue date
November 28, 2025
Served date
November 28, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning 3 story nfp building. observed at cellar level illegal class a apartment with no secondary means of egress and belco door lock from inside with ladder blocking steps.

What this violation means

DOB is alleging that required egress or a fire-escape route was obstructed or otherwise did not provide the required clear path. Egress conditions are life-safety issues and the exact route/location described matters.

What may be required to correct the condition

The cited path should be cleared or restored so required egress is unobstructed. If the issue involves construction, stairs, doors, fire escapes or layout rather than movable objects, professional review and permits may be needed before the condition can be considered corrected. Any correction should preserve the required egress route rather than simply moving the problem to another part of the exit system.

What the OATH hearing may involve

At OATH, photographs from the inspection date, floor/egress plans, evidence showing whether the obstruction existed, and proof of prompt correction can be relevant.

Possible defenses or factual issues worth investigating

Verify the exact egress route, whether the objects/condition actually reduced the required path, whether the cited area was a required exit component, and whether the condition had been corrected before or after service.

Documents and evidence that may be useful

  • dated photographs of the cited egress route
  • approved floor/egress plans where applicable
  • repair/removal records
  • inspection reports
  • proof of correction
Violation 4

Summons 39168636H — Electrical work without a permit

Normalized lookup key: 039168636H
OATH hearingNovember 13, 20269:00 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references cellar, electrical wiring/equipment and Class A residential occupancy.

Specific record details: cellar, electrical wiring/equipment, Class A residential occupancy.

Full violation description from the source extract

3 STORY NFP BUILDING WITH CELLAR. OBSERVED NEW ELECTRICAL WIRE FOR LIGHTS AND OUTLETS FOR ILLEGAL CLASS A APARTMENTS NO PERMIT ON RECORD FOR THIS WORK ATOI., OBTAIN PERMIT

Issue date
November 28, 2025
Served date
November 28, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning 3 story nfp building with cellar. observed new electrical wire for lights and outlets for illegal class a apartments no permit on record for this work atoi.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Property-specific resolution support

How Building Violation LLC may help at 94 Starr Street, Brooklyn, NY 11237

For 94 Starr Street, Brooklyn, NY 11237, the current source extract points to plumbing or gas work without a permit, egress / fire-escape obstruction, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.