November 2026 NYC DOB / ECB / OATH public-record review

975 Woodycrest Avenue, Bronx, NY 10452 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 975 Woodycrest Avenue, Bronx, NY 10452. The source records identify construction-site safety, dob/oath code-compliance issue, work not conforming to approved documents and a hearing date of November 6, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction-site safetyDOB/OATH code-compliance issueWork not conforming to approved documents

Property and hearing summary

Actual property address
975 Woodycrest Avenue, Bronx, NY 10452
Borough
Bronx
BIN
2003195
BBL
2025110100 (2/2511/100)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 6, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558509Z
Normalized: 039558509Z
November 6, 2026
8:30 AM
CLASS - 1 Construction-site safety
39558510X
Normalized: 039558510X
November 6, 2026
9:30 AM
CLASS - 2 DOB/OATH code-compliance issue
39558511H
Normalized: 039558511H
November 6, 2026
10:30 AM
CLASS - 1 Work not conforming to approved documents

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558509Z — Construction-site safety

Normalized lookup key: 039558509Z
OATH hearingNovember 6, 20268:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency. The inspector's description specifically references excavation and exposure 2.

Specific record details: excavation, exposure 2.

Full violation description from the source extract

AT TIME OF INSPECTION I OBSERVED EXCAVATION BEING CONDUCTED. OBSERVED FAILURE TO SAFEGUARD PEDESTRIANS AND ADJACENT PROPERTIES AT EXP 2 & 4 AT TIME OF INSPECTION I OBSERVED DAMAGES TO PROPERTY AT EXP 2 AND NO P

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed EXCAVATION BEING CONDUCTED. OBSERVED FAILURE TO SAFEGUARD PEDESTRIANS AND ADJACENT PROPERTIES AT EXP 2 & 4 AT TIME OF INSPECTION I OBSERVED DAMAGES TO PROPERTY AT EXP 2 AND NO P.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Violation 2

Summons 39558510X — DOB/OATH code-compliance issue

Normalized lookup key: 039558510X
OATH hearingNovember 6, 20269:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references front area.

Specific record details: front area.

Full violation description from the source extract

OBSERVED PROPOSED NB IN DEMO PHASE. AT TIME OF INSPECTION I OBSERVED A TRAILER ,PORTA POTTY AND JERSEY BARRIERS IN STREET IN FRONT OF JOB SITE. UPON REQUEST OF DOT PERMITS AND OR DOCUMENTS NONE WAS PROVIDED. NO

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed A TRAILER ,PORTA POTTY AND JERSEY BARRIERS IN STREET IN FRONT OF JOB SITE. UPON REQUEST OF DOT PERMITS AND OR DOCUMENTS NONE WAS PROVIDED. NO.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 3

Summons 39558511H — Work not conforming to approved documents

Normalized lookup key: 039558511H
OATH hearingNovember 6, 202610:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents. The inspector's description specifically references excavation.

Specific record details: excavation.

Full violation description from the source extract

AT TIME OF INSPECTION I OBSERVED EXCAVATION BEING CONDUCTED. UPON REVIEW OF DOB APPROVED PLANS WORK DOES NOT CONFORM TO APPROVED PLANS. TEST PIT ARE REQUIRED AT CHANGE IN FOUNDATION ELEMENTS, TEST PITS NOT PRES

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed EXCAVATION BEING CONDUCTED. UPON REVIEW OF DOB APPROVED PLANS WORK DOES NOT CONFORM TO APPROVED PLANS. TEST PIT ARE REQUIRED AT CHANGE IN FOUNDATION ELEMENTS, TEST PITS NOT PRES.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Property-specific resolution support

How Building Violation LLC may help at 975 Woodycrest Avenue, Bronx, NY 10452

For 975 Woodycrest Avenue, Bronx, NY 10452, the current source extract points to construction-site safety, dob/oath code-compliance issue, work not conforming to approved documents. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.