DOT permits are separate from DOB permits
A building permit does not authorize every street or sidewalk activity.
Many building projects require a second permit system outside DOB because construction affects streets, sidewalks or public space.
NYC DOT groups permits into street opening, building operations/construction activity, sidewalk construction, container and other right-of-way categories. The correct permit should be determined from the actual work zone and permittee.
A building permit does not authorize every street or sidewalk activity.
Street status should be checked before mobilization.
Traffic, pedestrian, restoration and placement conditions must be followed.
Send the property address, notice/violation/permit information and any available photos or agency documents. We will identify the immediate deadline and scope the next paid phase before detailed technical work begins.
Start Project IntakeThese links provide current government starting points. Agency systems, fees, forms and procedures can change; verify the current requirement before filing.