QEWI required
The façade report is a licensed-professional filing, not a generic expediter filing.
NYC façade compliance applies to buildings higher than six stories. Failure to file, unsafe façade conditions and late amended reports can create violations and escalating penalties.
DOB requires FISP reports through DOB NOW: Safety and a Qualified Exterior Wall Inspector (QEWI) for the technical report. Unsafe conditions must be corrected and an acceptable amended report filed.
The façade report is a licensed-professional filing, not a generic expediter filing.
Correction has to be documented through the FISP process.
Late filing and unsafe-condition penalties can accrue until the acceptable filing is made.
Send the property address, notice/violation/permit information and any available photos or agency documents. We will identify the immediate deadline and scope the next paid phase before detailed technical work begins.
Start Project IntakeThese links provide current government starting points. Agency systems, fees, forms and procedures can change; verify the current requirement before filing.