NYC DOB / ECB / OATH hearings · verified property resolution

1012 Manhattan Avenue, Brooklyn, NY 11222 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1012 Manhattan Avenue, Brooklyn, NY 11222 and source-listed date December 9, 2026. Recorded concerns include stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
1012 Manhattan Avenue, Brooklyn, NY 11222
Borough
Brooklyn
BIN
3064175
BBL
3025230006
Source summonses
2
Hearing dates in source
December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1012 MANHATTAN AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1012 Manhattan Avenue, Brooklyn, NY 11222?

The uploaded record lists 2 summonses, including 039206119Y (stop-work order / continued work), 039206120L (stop-work order / continued work). The source-listed hearing date: December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39206119Y
039206119Y
8:30 AM
CLASS - 2Stop-work order / continued workPENDING
39206120L
039206120L
9:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 2 recorded summonses relate at 1012 Manhattan Avenue, Brooklyn, NY 11222

The verified property matching links 2 distinct summonses to 1012 Manhattan Avenue, Brooklyn, NY 11222. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (2): source summons 039206119Y, 039206120L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 2 summonses list September 29, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39206119Y

Normalized ten-character lookup: 039206119Y (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: commercial space, kitchen or bathroom.

Inspector narrative as preserved in source data — potentially incomplete

PARTIAL STOP WORK ORDER ISSUED WITHOUT A PERMIT AT TIME OF INSPECTION OBSERVED ON THE FIRST FLOOR COMMERCIAL SPACE ONGOING G.C WORK NEWLY FRAMING METAL STUDS INSTALLED FOR DROP CEILING ALSO BATHROOM FRAMING AND

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1012 Manhattan Avenue, Brooklyn, NY 11222

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: commercial space, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “PARTIAL STOP WORK ORDER ISSUED WITHOUT A PERMIT AT TIME OF INSPECTION OBSERVED ON THE FIRST FLOOR COMMERCIAL SPACE ONGOING G.C WORK NEWLY FRAMING METAL STU…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206119Y.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved commercial use/occupancy and relevant interior photos
  • approved wet-room layouts and plumbing/alteration permits
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206119Y, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 1012 Manhattan Avenue, Brooklyn, NY 11222
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39206120L

Normalized ten-character lookup: 039206120L (infraction 101)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

PARTIAL STOP WORK ORDER ISSUED FOR ELECTRICAL WORK WITHOUT A PERMIT ON FILE WITH THE DEPT OF BUILDINGS. AT TIME OF INSPECTION OBSERVED NEW BX WIRING INSTALLED THROUGHOUT CEILING AND WALLS, NEW SWITCHES, RECEPTA

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 1012 Manhattan Avenue, Brooklyn, NY 11222

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “PARTIAL STOP WORK ORDER ISSUED FOR ELECTRICAL WORK WITHOUT A PERMIT ON FILE WITH THE DEPT OF BUILDINGS. AT TIME OF INSPECTION OBSERVED NEW BX WIRING INSTAL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206120L.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206120L, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 1012 Manhattan Avenue, Brooklyn, NY 11222
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1012 Manhattan Avenue, Brooklyn, NY 11222 — not just the summons number

For this property, start with stop-work order / continued work. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 9, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.