105-46 135 Street, Queens, NY 11419 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 105-46 135 Street, Queens, NY 11419 and source-listed date December 15, 2026. Recorded concerns include work without a permit, fire escape / exit obstruction, unpermitted electrical work and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permitFire escape / exit obstructionUnpermitted electrical workIllegal occupancy / certificate of occupancy
Verified premises, hearing and enforcement snapshot
Verified premises address
105-46 135 Street, Queens, NY 11419
Borough
Queens
BIN
4205213
BBL
4095940022
Source summonses
5
Hearing dates in source
December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 105-46 135 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 105-46 135 Street, Queens, NY 11419?
The uploaded record lists 5 summonses, including 039200213N (fire escape / exit obstruction), 039200214P (unpermitted electrical work), 039200215R (work without a permit), 039200216Z (work without a permit) and additional tickets. The source-listed hearing date: December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 105-46 135 Street, Queens, NY 11419
The verified property matching links 5 distinct summonses to 105-46 135 Street, Queens, NY 11419. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Work without a permit (2): source summons 039200215R, 039200216Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Fire escape / exit obstruction (1): source summons 039200213N. Check this charge separately, even when its documents can be gathered with other property records.
Illegal occupancy / certificate of occupancy (1): source summons 039200217K. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039200214P. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 5 summonses list August 11, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: The same approved floor plan may be relevant to lawful occupancy and means of egress; removing an exit obstruction does not automatically legalize an extra dwelling unit.
Potential shared workstream: If a project altered the same route of exit, the permit review and egress correction may require one coordinated plan; establish that connection from the approved plans and cited locations.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Fire escape / exit obstruction — ECB/OATH summons 39200213N
The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, door or exit route.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. THE BOILER ROOM IS NOT PROPERLY ENCLOSED IN THE CELLAR WITH A FIRE-RATED DOOR OR FRESH AIR INTAKE. THE CELLAR HAS ONLY ONE MEANS OF EGRESS., REPAIR AND/R
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 105-46 135 Street, Queens, NY 11419
Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, door or exit route. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. THE BOILER ROOM IS NOT PROPERLY ENCLOSED IN THE CELLAR WITH A FIRE-RATED DOOR OR FRESH AIR INTAKE.…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200213N.
Whether the cited route is a required exit component for this occupancy
Whether the alleged objects, locks or configuration actually affected required egress at the cited location
Whether the area and date are accurately identified and whether correction can be documented
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Remove hazards and restore required safe egress immediately.
When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed-trade test results and equipment/permit records
door/exit photographs and approved egress plans
photographs of the exact door, stair, hall, landing or fire escape
approved floor and means-of-egress plans
repair/removal invoices and dated completion photographs
fire-escape or professional inspection and compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200213N, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR 3PC BATHROOMS, KITCHEN AREA AND (2) ROOMS. NO PERMIT ON FILE FOR ELECTRICAL WORK P
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 105-46 135 Street, Queens, NY 11419
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR 3PC BATHROOMS, KITCHEN AREA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200214P.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed electrician report and electrical filing history
approved wet-room layouts and plumbing/alteration permits
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200214P, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR 3PC BATHROOMS, KITCHEN AREA AND (2) ROOMS. NO PERMIT ON FILE FOR WORK PERFORMED.,
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 105-46 135 Street, Queens, NY 11419
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR 3PC BATHROOMS, KITCHEN AREA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200215R.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200215R, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, kitchen or bathroom.
Inspector narrative as preserved in source data
WORK WITHOUT A PERMIT. OBSERVED AT CELLAR LEVEL WATER AND WASTE LINES FOR A 3-PC BATHROOM, RESIDENTIAL SINK AND GAS STOVE. NO PLUMBING PERMIT ON FILE FOR WORK PERFORMED., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 105-46 135 Street, Queens, NY 11419
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. OBSERVED AT CELLAR LEVEL WATER AND WASTE LINES FOR A 3-PC BATHROOM, RESIDENTIAL SINK AND GAS STOVE. NO PLUMBING PERMIT ON FILE FOR W…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200216Z.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed-trade test results and equipment/permit records
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200216Z, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O. OBSERVED OPEN CELLAR CONVERTED/ SUBDIVIDE WITH FULL-HEIGHT PARTITIONS INTO A CLASS A APT WITH A 3-PIECE BATH, KITCHEN WITH SINK & GAS STOVE AND 2 ROOMS FOR SLEE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 105-46 135 Street, Queens, NY 11419
Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O. OBSERVED OPEN CELLAR CONVERTED/ SUBDIVIDE WITH FULL-HEIGHT PARTITIONS INTO A CLASS A APT WITH A 3-PIECE B…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200217K.
Whether the cited space and alleged use match the actual premises and inspection period
Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
Whether the described occupants, partitioning or unit configuration existed at the relevant time
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed-trade test results and equipment/permit records
approved unit layout and relevant lawful occupancy records
current and historical Certificates of Occupancy or DOB occupancy records
approved floor plans, unit-count and building-use documentation
dated floor/interior photographs and credible usage records
lease or occupancy documents appropriately redacted
professional survey/architectural assessment and permit history
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200217K, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 105-46 135 Street, Queens, NY 11419 — not just the summons number
For this property, start with work without a permit and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 15, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.