Work contrary to approved plans — ECB/OATH summons 39177836R
Normalized ten-character lookup: 039177836R (infraction 114)
Source allegation and actual cited law
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: rear exposure or yard.
Inspector narrative as preserved in source data
ATOI, OBSERVED WORK DOES NOT CONFORM TO APPROVED DRAWINGS UNDER JOB # B01124656. NO DEMOLITION DETAILS PROVIDED FOR THE EXISTING REAR EXTENSION BUILT TO THE LOT LINE., COMPLY WITH CODE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 114 — 28-105.12.2 WK DOESN'T CONFORM TO APPRV CONST DOC/AMENDS IN MANUF DIST RES USE
- Issue date
- February 19, 2026
- Service date
- February 19, 2026
- Source severity
- CLASS - 1
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $5,000.00
- Balance field in extract
- $5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 1059 East 24 Street, Brooklyn, NY 11210
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED WORK DOES NOT CONFORM TO APPROVED DRAWINGS UNDER JOB # B01124656. NO DEMOLITION DETAILS PROVIDED FOR THE EXISTING REAR EXTENSION BUILT TO TH…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039177836R.
- Whether the cited plans were the operative approved set on the inspection date
- Whether an approved amendment, phased work or as-built record covers the observed condition
- Whether the alleged difference is accurately described and located
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Compare field conditions with approved documents through a registered design professional.
- Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- rear-exposure photos tied to the inspection date
- approved plans, amendments and application history
- current as-built measurements or professional field report
- dated construction photographs and contractor records
- inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039177836R, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
Request help with work contrary to approved plans at 1059 East 24 Street, Brooklyn, NY 11210