108-50 71 Avenue, Queens, NY 11375 — Unpermitted electrical work and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 108-50 71 Avenue, Queens, NY 11375 and source-listed dates December 1, 2026, December 15, 2026. Recorded concerns include unpermitted electrical work, boiler / gas / plumbing compliance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Unpermitted electrical workBoiler / gas / plumbing compliance
Verified premises, hearing and enforcement snapshot
Verified premises address
108-50 71 Avenue, Queens, NY 11375
Borough
Queens
BIN
4052349
BBL
4022240028
Source summonses
2
Hearing dates in source
December 1, 2026, December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 108-50 71 AVENUE; 71-06 110 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: 2 default-status record(s) in the source; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 108-50 71 Avenue, Queens, NY 11375?
The uploaded record lists 2 summonses, including 039168402P (unpermitted electrical work), 039168401N (boiler / gas / plumbing compliance). The source-listed hearing dates: December 1, 2026, December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 108-50 71 Avenue, Queens, NY 11375
The verified property matching links 2 distinct summonses to 108-50 71 Avenue, Queens, NY 11375. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Boiler / gas / plumbing compliance (1): source summons 039168401N. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039168402P. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list November 25, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
More than one source-listed hearing date: December 1, 2026, December 15, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Unpermitted electrical work — ECB/OATH summons 39168402P
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation, apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION OBSERVED ELECTRICAL WORK IN APARTMENT 5I WITHOUT PERMIT ON FILE WITH THE DEPT OF BUILDINGS INSTALLATION OF NEW RECESSED LIGHTING NEW SWITCHES AND RECEPTACLES INSTALLED AND EXPOSED WIRING O
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
November 25, 2025
Service date
November 25, 2025
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$830.00
Balance field in extract
$830.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 108-50 71 Avenue, Queens, NY 11375
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED ELECTRICAL WORK IN APARTMENT 5I WITHOUT PERMIT ON FILE WITH THE DEPT OF BUILDINGS INSTALLATION OF NEW RECESSED LIGHTING NEW…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039168402P.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
approved unit layout and relevant lawful occupancy records
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039168402P, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. Key locations/components named in the source: gas or boiler equipment, apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION OBSERVED IN APARTMENT 5I FAILURE TO MAINTAIN GAS LINE AND WATER LINE THAT WAS DISCONNECTED DURING TEMPORARY CONSTRUCTION HAS TO BE CAPPED TO AVOID ACCIDENT OF LEAKAGE TO OCCUPANCY., REPAIR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
November 25, 2025
Service date
November 25, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$1,280.00
Balance field in extract
$1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 108-50 71 Avenue, Queens, NY 11375
Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. Key locations/components named in the source: gas or boiler equipment, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED IN APARTMENT 5I FAILURE TO MAINTAIN GAS LINE AND WATER LINE THAT WAS DISCONNECTED DURING TEMPORARY CONSTRUCTION HAS TO BE CA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039168401N.
Whether a required permit, inspection or periodic filing actually applied at that time
Whether licensed-trade repairs, test results or sign-offs already address the cited item
Whether the exact equipment and property location match the notice
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed-trade test results and equipment/permit records
approved unit layout and relevant lawful occupancy records
plumbing/gas/boiler permit and inspection history
licensed contractor reports, tests and paid invoices
equipment photographs, serials or specifications
DOB/utility correspondence and accepted sign-offs
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039168401N, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 108-50 71 Avenue, Queens, NY 11375 — not just the summons number
For this property, start with unpermitted electrical work and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
Boiler / gas / plumbing compliance (1 source summons): Mechanical/plumbing violation research and licensed-trade correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 1, 2026, December 15, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.