Construction fence / site protection — ECB/OATH summons 39560611H
Normalized ten-character lookup: 039560611H (infraction 211)
Source allegation and actual cited law
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: front exposure, construction fence or enclosure.
Inspector narrative as preserved in source data
OBSERVED CONSTRUCTION FENCE AT EXP 1 WITHOUT THE REQUIRED VIEWING PANELS. COMPLY WITH BC 3307.7PROVIDE/MAINTAIN VIEWING PANELS AS PER BC 3307.7
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
- Issue date
- October 15, 2026
- Service date
- October 15, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,000.00
- Balance field in extract
- $1,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 112-25 69 Avenue, Queens, NY 11375
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: front exposure, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “OBSERVED CONSTRUCTION FENCE AT EXP 1 WITHOUT THE REQUIRED VIEWING PANELS. COMPLY WITH BC 3307.7PROVIDE/MAINTAIN VIEWING PANELS AS PER BC 3307.7”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560611H.
- Whether the cited condition existed at the exact exposure or location alleged
- Whether the protection system and permit met the requirements applicable to this site
- Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Address unsafe public access or exposed hazards immediately.
- Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- front-exposure photos showing the area alleged
- site-fence photos, dimensions and inspection log
- site safety or construction fence drawings/permits
- dated photographs showing the cited exposure and dimensions
- daily inspection logs and contractor repair tickets
- documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560611H, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
Request help with construction fence / site protection at 112-25 69 Avenue, Queens, NY 11375